A platform for research: civil engineering, architecture and urbanism
Ballastless line track plate replacement operation method
The invention discloses a ballastless line track plate replacement operation method. The method comprises the following steps that fasteners of an old track plate to be replaced are removed; the track plate replacing device is transported by the first transport flatcar, and the track plate is transported by the second transport flatcar; after running to an operation position, the vehicle stops, the track plate replacing device is unloaded to the line, and a new track plate is unloaded to the line; track lifting and track shifting operation is carried out through the track plate replacing device, and then the first track plate is replaced; the new track plate and the old track plate are shifted through the track plate replacing device, and then the second track plate is replaced; track lifting and track shifting operation is carried out through the track plate replacing device, and then the old track plate is hoisted to the second transport flatcar; the track plate replacing device is recycled to the first transport flatcar; and the vehicle marshalling is driven away from the operation site, and replacement of the track plate is completed. The technical problems that an existing track plate replacement operation method is high in labor intensity and low in safety and operation efficiency can be solved.
本申请公开了一种无砟线路轨道板更换作业方法,包括以下步骤:对待更换的旧轨道板进行扣件拆除;由第一运输平车运输轨道板更换装置,第二运输平车运输轨道板;当行驶至作业位置后停车,将轨道板更换装置卸载至线路上,新轨道板卸载至线路上;通过轨道板更换装置进行起道及拨轨作业,再进行第一块轨道板更换;通过轨道板更换装置进行新轨道板和旧轨道板的移位,再进行第二块轨道板更换;通过轨道板更换装置进行起道及拨轨作业,再将旧轨道板吊运至第二运输平车上;将轨道板更换装置回收至第一运输平车上;车辆编组驶离作业现场,完成轨道板的更换。本申请能解决现有轨道板更换作业方法劳动强度大,安全性和作业效率低下的技术问题。
Ballastless line track plate replacement operation method
The invention discloses a ballastless line track plate replacement operation method. The method comprises the following steps that fasteners of an old track plate to be replaced are removed; the track plate replacing device is transported by the first transport flatcar, and the track plate is transported by the second transport flatcar; after running to an operation position, the vehicle stops, the track plate replacing device is unloaded to the line, and a new track plate is unloaded to the line; track lifting and track shifting operation is carried out through the track plate replacing device, and then the first track plate is replaced; the new track plate and the old track plate are shifted through the track plate replacing device, and then the second track plate is replaced; track lifting and track shifting operation is carried out through the track plate replacing device, and then the old track plate is hoisted to the second transport flatcar; the track plate replacing device is recycled to the first transport flatcar; and the vehicle marshalling is driven away from the operation site, and replacement of the track plate is completed. The technical problems that an existing track plate replacement operation method is high in labor intensity and low in safety and operation efficiency can be solved.
本申请公开了一种无砟线路轨道板更换作业方法,包括以下步骤:对待更换的旧轨道板进行扣件拆除;由第一运输平车运输轨道板更换装置,第二运输平车运输轨道板;当行驶至作业位置后停车,将轨道板更换装置卸载至线路上,新轨道板卸载至线路上;通过轨道板更换装置进行起道及拨轨作业,再进行第一块轨道板更换;通过轨道板更换装置进行新轨道板和旧轨道板的移位,再进行第二块轨道板更换;通过轨道板更换装置进行起道及拨轨作业,再将旧轨道板吊运至第二运输平车上;将轨道板更换装置回收至第一运输平车上;车辆编组驶离作业现场,完成轨道板的更换。本申请能解决现有轨道板更换作业方法劳动强度大,安全性和作业效率低下的技术问题。
Ballastless line track plate replacement operation method
一种无砟线路轨道板更换作业方法
YAN HONGWEN (author) / ZHANG DONGFANG (author) / NIU XUEXIN (author) / ZHU LIJUN (author) / HE WEIGUO (author) / ZHU WEILIANG (author) / WANG PENGJU (author) / CHEN LIANGPEI (author) / LUO QIANXING (author) / XIONG WEN (author)
2023-04-18
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Ballastless line track plate replacement device and operation system
European Patent Office | 2023
|Ballastless track plate replacement system, replacement vehicle and replacement method
European Patent Office | 2023
|Rapid replacement system and method for ballastless track bed of subway operation line
European Patent Office | 2024
|Ballastless track bed hidden structure replacement method
European Patent Office | 2020
|