A platform for research: civil engineering, architecture and urbanism
Unloading platform and unloading method for high-rise building
The invention discloses a high-rise building discharging platform and a discharging method, the high-rise building discharging platform comprises a working platform and a cantilever beam, fixing plates are symmetrically installed at the two ends of the working platform, fixing holes are formed in the fixing plates, and supports are symmetrically installed on one side of the upper end of the working platform. The device has the beneficial effects that by arranging a set of automatic moving mechanism composed of an electromagnet, a magnetic block, a second telescopic column, a second spring, a motor, a screw block and a screw rod, in the moving process of the carrying box, the electromagnet is powered on so that the carrying box can be attracted and fixed through the magnetic block, then the motor drives the screw rod to rotate, and then the screw block drives the carrying box to automatically move; and when moving to the edge of the working platform, the electromagnet is powered off to relieve fixation, meanwhile, a second telescopic column and a second spring are combined to reset the magnetic block, the situation that the workload of workers is large due to manual pulling is avoided, and the practicability of the device is improved.
本发明公开了一种高层建筑卸料平台及卸料方法,包括工作平台和悬挑梁,所述工作平台两端对称安装有固定板,所述固定板上开设有固定孔,所述工作平台上端一侧对称安装有支座。有益效果在于:通过设置一组由电磁铁、磁块、伸缩柱二、弹簧二、电机、螺块以及螺杆组成的自动移动机构,在载物箱移动过程中,电磁铁通电,使其通过磁块对载物箱进行吸附固定,然后电机带动螺杆转动,进而使螺块带动载物箱自动移动,当移动到工作平台边缘时,电磁铁断电对其固定解除,同时伸缩柱二与弹簧二相结合将磁块进行复位,避免因人工拉动而导致工作人员工作量大,提高装置实用性。
Unloading platform and unloading method for high-rise building
The invention discloses a high-rise building discharging platform and a discharging method, the high-rise building discharging platform comprises a working platform and a cantilever beam, fixing plates are symmetrically installed at the two ends of the working platform, fixing holes are formed in the fixing plates, and supports are symmetrically installed on one side of the upper end of the working platform. The device has the beneficial effects that by arranging a set of automatic moving mechanism composed of an electromagnet, a magnetic block, a second telescopic column, a second spring, a motor, a screw block and a screw rod, in the moving process of the carrying box, the electromagnet is powered on so that the carrying box can be attracted and fixed through the magnetic block, then the motor drives the screw rod to rotate, and then the screw block drives the carrying box to automatically move; and when moving to the edge of the working platform, the electromagnet is powered off to relieve fixation, meanwhile, a second telescopic column and a second spring are combined to reset the magnetic block, the situation that the workload of workers is large due to manual pulling is avoided, and the practicability of the device is improved.
本发明公开了一种高层建筑卸料平台及卸料方法,包括工作平台和悬挑梁,所述工作平台两端对称安装有固定板,所述固定板上开设有固定孔,所述工作平台上端一侧对称安装有支座。有益效果在于:通过设置一组由电磁铁、磁块、伸缩柱二、弹簧二、电机、螺块以及螺杆组成的自动移动机构,在载物箱移动过程中,电磁铁通电,使其通过磁块对载物箱进行吸附固定,然后电机带动螺杆转动,进而使螺块带动载物箱自动移动,当移动到工作平台边缘时,电磁铁断电对其固定解除,同时伸缩柱二与弹簧二相结合将磁块进行复位,避免因人工拉动而导致工作人员工作量大,提高装置实用性。
Unloading platform and unloading method for high-rise building
一种高层建筑卸料平台及卸料方法
LONG YUANGANG (author)
2023-04-18
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Fabricated unloading platform for high-rise building construction
European Patent Office | 2020
|Self-unloading type unloading platform and method for building
European Patent Office | 2022
|