A platform for research: civil engineering, architecture and urbanism
The invention provides a deep foundation pit reinforcing structure which comprises a reinforcing structure body, the reinforcing structure body comprises a fence assembly, a correcting mechanism and a reinforcing rod, the fence assembly is used in a butt joint mode through a plurality of coamings, butt joint sleeves are arranged on the side edges of the coamings, and gaps are formed between the butt joint sleeves on the same side of the coamings. The correcting mechanism is installed at the front end of the surrounding plate, the inner side of the surrounding plate is pressed on the inner wall of the deep foundation pit, the bottom end of the surrounding plate makes contact with the base part of the deep foundation pit, the deep foundation pit reinforcing structure adopts the multiple sets of anchor rods to be connected to the bottom of the deep foundation pit and the ground above the deep foundation pit in an inserted mode, and the inner wall of the deep foundation pit is prevented from being damaged; the construction process of a deep foundation pit is simplified, the pipeline structures are arranged in the reinforcing rods, after the reinforcing mechanism is constructed, water can be directly pulled out along the reinforcing rods when accumulated water is generated in the deep foundation pit, and the efficient drainage function is provided.
本发明提供一种深基坑加固结构,包括加固结构本体,所述加固结构本体包括围挡组件、矫正机构和加固杆,所述围挡组件通过多个围板进行对接使用,所述围板的侧边设置有对接套筒,且围板同一侧的对接套筒之间设置有缺口,所述矫正机构安装在围板的前端,所述围板的内侧按压在深基坑的内壁上,且围板的底端与深基坑的基底部分相接触,该深基坑加固结构采用多组锚杆均插接到深基坑的底部以及上方的地面上,避免对深基坑的内壁产生破坏,对于较深的基坑简化了搭建的流程,在加固杆的内部设置有管路结构,将该加固机构搭建完成后,可在深基坑内产生积水时直接沿着加固杆向外抽出,提供了高效的排水功能。
The invention provides a deep foundation pit reinforcing structure which comprises a reinforcing structure body, the reinforcing structure body comprises a fence assembly, a correcting mechanism and a reinforcing rod, the fence assembly is used in a butt joint mode through a plurality of coamings, butt joint sleeves are arranged on the side edges of the coamings, and gaps are formed between the butt joint sleeves on the same side of the coamings. The correcting mechanism is installed at the front end of the surrounding plate, the inner side of the surrounding plate is pressed on the inner wall of the deep foundation pit, the bottom end of the surrounding plate makes contact with the base part of the deep foundation pit, the deep foundation pit reinforcing structure adopts the multiple sets of anchor rods to be connected to the bottom of the deep foundation pit and the ground above the deep foundation pit in an inserted mode, and the inner wall of the deep foundation pit is prevented from being damaged; the construction process of a deep foundation pit is simplified, the pipeline structures are arranged in the reinforcing rods, after the reinforcing mechanism is constructed, water can be directly pulled out along the reinforcing rods when accumulated water is generated in the deep foundation pit, and the efficient drainage function is provided.
本发明提供一种深基坑加固结构,包括加固结构本体,所述加固结构本体包括围挡组件、矫正机构和加固杆,所述围挡组件通过多个围板进行对接使用,所述围板的侧边设置有对接套筒,且围板同一侧的对接套筒之间设置有缺口,所述矫正机构安装在围板的前端,所述围板的内侧按压在深基坑的内壁上,且围板的底端与深基坑的基底部分相接触,该深基坑加固结构采用多组锚杆均插接到深基坑的底部以及上方的地面上,避免对深基坑的内壁产生破坏,对于较深的基坑简化了搭建的流程,在加固杆的内部设置有管路结构,将该加固机构搭建完成后,可在深基坑内产生积水时直接沿着加固杆向外抽出,提供了高效的排水功能。
European Patent Office | 2018
|Foundation reinforcing structure of shallow-buried structure around deep foundation pit
European Patent Office | 2024
|METHOD FOR REINFORCING FOUNDATION STRUCTURE AND STRUCTURE FOR REINFORCING FOUNDATION STRUCTURE
European Patent Office | 2020
|Building foundation reinforcing structure and building foundation reinforcing method
European Patent Office | 2024
|Inner support reinforcing structure of deep foundation pit
European Patent Office | 2023
|