High-position intercepting and draining ditch and construction method
The invention discloses a high-position water intercepting and draining ditch and a construction method, the high-position water intercepting and draining ditch comprises a water intercepting and draining ditch main body which is arranged on one side, close to a road side slope, of a road and is close to the road, the lower part of the water intercepting and draining ditch main body is embedded in a soil body of the road side slope, and the upper part of the water intercepting and draining ditch main body is higher than the road surface of the road. Only the lower portion of the interception and drainage ditch body is embedded in a soil body of a road slope, the excavation amount and the earthwork backfilling amount in the construction process can be reduced, and therefore the construction amount and the construction cost can be reduced, meanwhile, the interception and drainage ditch body is arranged on the side, close to the road slope, of a road, is close to the road and is integrated with a slope toe slope, and the construction cost is reduced. The upper portion of the intercepting and draining ditch body is higher than the road surface of the road, so that the risk that vehicles and pedestrians fall into the intercepting and draining ditch body is avoided, a cover plate does not need to be arranged, and the workload during clearing and maintenance is reduced.
本发明公开了一种高位截排水沟及施工方法,高位截排水沟包括:截排水沟主体,设置于道路靠近公路边坡的一侧并紧邻道路,所述截排水沟主体的下部嵌设于公路边坡的土体内,所述截排水沟主体的上部高出于道路的路面。所述截排水沟主体仅下部嵌设于公路边坡的土体内,有利于减少施工过程中的开挖量和土方回填量,从而有利于减少施工量及施工成本,同时,所述截排水沟主体设置于道路靠近公路边坡的一侧并紧邻道路,与坡脚斜坡融为一体,不占用坡脚外人行道带宽空间,有利于更好地增加道路的可用宽度,而且由于所述截排水沟主体的上部高出于道路的路面,因此不存在车辆和行人跌入其中的风险,故无需设置盖板,有利于减少清疏维护时的工作量。
High-position intercepting and draining ditch and construction method
The invention discloses a high-position water intercepting and draining ditch and a construction method, the high-position water intercepting and draining ditch comprises a water intercepting and draining ditch main body which is arranged on one side, close to a road side slope, of a road and is close to the road, the lower part of the water intercepting and draining ditch main body is embedded in a soil body of the road side slope, and the upper part of the water intercepting and draining ditch main body is higher than the road surface of the road. Only the lower portion of the interception and drainage ditch body is embedded in a soil body of a road slope, the excavation amount and the earthwork backfilling amount in the construction process can be reduced, and therefore the construction amount and the construction cost can be reduced, meanwhile, the interception and drainage ditch body is arranged on the side, close to the road slope, of a road, is close to the road and is integrated with a slope toe slope, and the construction cost is reduced. The upper portion of the intercepting and draining ditch body is higher than the road surface of the road, so that the risk that vehicles and pedestrians fall into the intercepting and draining ditch body is avoided, a cover plate does not need to be arranged, and the workload during clearing and maintenance is reduced.
本发明公开了一种高位截排水沟及施工方法,高位截排水沟包括:截排水沟主体,设置于道路靠近公路边坡的一侧并紧邻道路,所述截排水沟主体的下部嵌设于公路边坡的土体内,所述截排水沟主体的上部高出于道路的路面。所述截排水沟主体仅下部嵌设于公路边坡的土体内,有利于减少施工过程中的开挖量和土方回填量,从而有利于减少施工量及施工成本,同时,所述截排水沟主体设置于道路靠近公路边坡的一侧并紧邻道路,与坡脚斜坡融为一体,不占用坡脚外人行道带宽空间,有利于更好地增加道路的可用宽度,而且由于所述截排水沟主体的上部高出于道路的路面,因此不存在车辆和行人跌入其中的风险,故无需设置盖板,有利于减少清疏维护时的工作量。
High-position intercepting and draining ditch and construction method
高位截排水沟及施工方法
CAI JIANBO (author) / ZHANG YONGXIONG (author)
2023-05-02
Patent
Electronic Resource
Chinese
IPC:
E03F
SEWERS
,
Abwasserkanäle
Flexible ecological intercepting and draining ditch construction method
European Patent Office | 2024
|Intercepting ditch, drainage system and manufacturing method of intercepting ditch
European Patent Office | 2021
|