A platform for research: civil engineering, architecture and urbanism
Deep and thick covering layer pile foundation concrete combined dam structure and construction method thereof
The invention discloses a deep covering layer pile foundation concrete combined dam structure and a construction method thereof, the pile foundation concrete combined dam structure comprises a plurality of concrete dam sections of hollow structures, the upstream slope angle of each concrete dam section is 50-80 degrees, and the downstream slope angle of each concrete dam section is 80-90 degrees; the rubber cushion layers are arranged at the connecting parts between the concrete dam sections and are connected through the dampers; the damper is arranged in a cavity of the concrete dam section; a concrete pile and an anti-seepage wall are arranged in the deep covering layer and used for supporting the concrete dam section. The invention has the advantages of light dead weight, small section size, good economy and low construction difficulty, and can be suitable for use under the condition of limited topographic conditions.
本发明公开了一种深厚覆盖层桩基混凝土组合坝结构及其施工方法,该桩基混凝土组合坝结构包括若干空心结构的混凝土坝段,混凝土坝段上游坡角为50°~80°,下游坡角为80°~90°;混凝土坝段之间连接部位设置橡胶垫层,并通过阻尼器相连;阻尼器设置在混凝土坝段空腔中;深厚覆盖层中设置混凝土桩和防渗墙,用以支撑混凝土坝段。本发明具有自重轻、断面尺寸小、经济性好、施工难度小的优点,能够适于地形条件受限情况下使用。
Deep and thick covering layer pile foundation concrete combined dam structure and construction method thereof
The invention discloses a deep covering layer pile foundation concrete combined dam structure and a construction method thereof, the pile foundation concrete combined dam structure comprises a plurality of concrete dam sections of hollow structures, the upstream slope angle of each concrete dam section is 50-80 degrees, and the downstream slope angle of each concrete dam section is 80-90 degrees; the rubber cushion layers are arranged at the connecting parts between the concrete dam sections and are connected through the dampers; the damper is arranged in a cavity of the concrete dam section; a concrete pile and an anti-seepage wall are arranged in the deep covering layer and used for supporting the concrete dam section. The invention has the advantages of light dead weight, small section size, good economy and low construction difficulty, and can be suitable for use under the condition of limited topographic conditions.
本发明公开了一种深厚覆盖层桩基混凝土组合坝结构及其施工方法,该桩基混凝土组合坝结构包括若干空心结构的混凝土坝段,混凝土坝段上游坡角为50°~80°,下游坡角为80°~90°;混凝土坝段之间连接部位设置橡胶垫层,并通过阻尼器相连;阻尼器设置在混凝土坝段空腔中;深厚覆盖层中设置混凝土桩和防渗墙,用以支撑混凝土坝段。本发明具有自重轻、断面尺寸小、经济性好、施工难度小的优点,能够适于地形条件受限情况下使用。
Deep and thick covering layer pile foundation concrete combined dam structure and construction method thereof
一种深厚覆盖层桩基混凝土组合坝结构及其施工方法
YANG GUI (author) / CHEN ZHUANZHUAN (author) / WU JIEXIN (author) / ZHU JIN (author) / ZHANG YANMEI (author)
2023-05-05
Patent
Electronic Resource
Chinese
Deep water deep covering layer aqueduct pile foundation construction device and method
European Patent Office | 2024
|European Patent Office | 2021
|Gravel pile foundation stilling pool on deep covering layer and construction method
European Patent Office | 2022
|Thick soft soil layer pile foundation construction method
European Patent Office | 2022
|European Patent Office | 2023
|