A platform for research: civil engineering, architecture and urbanism
Connecting structure of ceramic rod curtain wall and main body structure and construction method of connecting structure
The invention relates to a connecting structure of a ceramic rod curtain wall and a main body structure and a construction method of the connecting structure. The connecting structure comprises embedded parts which are arranged at intervals and embedded in the main body structure, and the embedded parts partially extend out of the main body structure; the fixing part is fixed at the extending end of the embedded part, and part of the fixing part protrudes outwards to form a mounting plate parallel to the main body structure; the connecting pieces correspond to the embedded pieces and are fixedly arranged on the ceramic rod curtain wall at intervals, parts of the connecting pieces protrude outwards to form connecting plates parallel to the mounting plate, and the connecting plates are fixedly connected with the mounting plate, so that the ceramic rod curtain wall is fixedly connected with the main body structure. The problems that aloft work is complex and long in time are effectively solved, and the aloft work time is shortened, construction safety is guaranteed, and construction efficiency is improved by optimizing the connecting structure of the ceramic rod curtain wall and the main body structure and simplifying the installation procedure.
本发明涉及一种陶棍幕墙与主体结构的连接结构及其施工方法,包括:间隔设置且埋设于主体结构的预埋件,预埋件有部分伸出主体结构;固定于预埋件的伸出端的固定件,固定件有部分向外凸伸以形成与主体结构平行的安装板;以及对应预埋件且间隔固设于陶棍幕墙的连接件,连接件有部分向外凸伸以形成与安装板平行的连接板,通过连接板与安装板固定连接,使得陶棍幕墙与主体结构固定连接。本发明有效地解决了高空作业复杂且时间长的问题,通过优化陶棍幕墙与主体结构的连接结构,简化安装工序,以缩短高空作业的时间,保证施工安全,提升施工效率。
Connecting structure of ceramic rod curtain wall and main body structure and construction method of connecting structure
The invention relates to a connecting structure of a ceramic rod curtain wall and a main body structure and a construction method of the connecting structure. The connecting structure comprises embedded parts which are arranged at intervals and embedded in the main body structure, and the embedded parts partially extend out of the main body structure; the fixing part is fixed at the extending end of the embedded part, and part of the fixing part protrudes outwards to form a mounting plate parallel to the main body structure; the connecting pieces correspond to the embedded pieces and are fixedly arranged on the ceramic rod curtain wall at intervals, parts of the connecting pieces protrude outwards to form connecting plates parallel to the mounting plate, and the connecting plates are fixedly connected with the mounting plate, so that the ceramic rod curtain wall is fixedly connected with the main body structure. The problems that aloft work is complex and long in time are effectively solved, and the aloft work time is shortened, construction safety is guaranteed, and construction efficiency is improved by optimizing the connecting structure of the ceramic rod curtain wall and the main body structure and simplifying the installation procedure.
本发明涉及一种陶棍幕墙与主体结构的连接结构及其施工方法,包括:间隔设置且埋设于主体结构的预埋件,预埋件有部分伸出主体结构;固定于预埋件的伸出端的固定件,固定件有部分向外凸伸以形成与主体结构平行的安装板;以及对应预埋件且间隔固设于陶棍幕墙的连接件,连接件有部分向外凸伸以形成与安装板平行的连接板,通过连接板与安装板固定连接,使得陶棍幕墙与主体结构固定连接。本发明有效地解决了高空作业复杂且时间长的问题,通过优化陶棍幕墙与主体结构的连接结构,简化安装工序,以缩短高空作业的时间,保证施工安全,提升施工效率。
Connecting structure of ceramic rod curtain wall and main body structure and construction method of connecting structure
陶棍幕墙与主体结构的连接结构及其施工方法
CAO LEI (author) / DING WEI (author) / XIAO DICHENG (author) / XU BINGLIN (author) / ZHANG CHENGPENG (author) / WANG KUNRONG (author) / WANG ZHEN (author) / CHEN XING (author)
2023-05-05
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2023
|European Patent Office | 2022
|Curtain wall and main structure connecting structure and construction method thereof
European Patent Office | 2020
|Connecting structure of curtain wall and curtain wall construction method
European Patent Office | 2023
|