The invention relates to the technical field of house building construction, and discloses a house building pile foundation construction method which comprises the steps that S1, a site is leveled, specifically, the site is leveled according to the regional position and size of a construction drawing corresponding to an actual construction site; s2, a mud pit is arranged, the mud pit is designed and excavated according to the operation area, and the mud pit is divided into a settling pond and a mud storage pond; S3, surveying and setting out are conducted, and setting out and positioning are conducted according to the requirements of a construction drawing. When a pile head is subjected to ring cutting, the pile head can enter through the notch in the bottom plate, after the pile head enters, the height of the platform plate can be flexibly adjusted and controlled through the hydraulic rod so as to meet different ring cutting height requirements, and when ring cutting work is carried out, the cutting depth in the cutting mechanism is adjusted, the cutting depth can be controlled, precise cutting is achieved, and the cutting efficiency is improved. And the possibility that the main body structure is damaged due to the fact that the cutting precision cannot be guaranteed by manual cutting and internal reinforcing bars are easily cut can be effectively avoided.
本申请涉及房建施工技术领域,且公开了一种房建桩基的施工方法,包括S1.场地平整,按照施工图纸对应实际施工场地的区域位置和大小,并对场地进行平整;S2.设置泥浆池,根据作业区进行设计并开挖泥浆池,且泥浆池应划分为沉淀池和储浆池:S3.测量放线,按照施工图纸要求进行放线定位。在对桩头进行环切时,通过底板上的缺口可供桩头进入,并且在进入后,通过液压杆可灵活调控平台板的高度,以应对不同的环切高度需求,并且在环切工作进行的时候,通过对切割机构中的切割深度进行调节,可控制切割深度,实现精准切割,可有效避免由人工切割而无法保证切割精度,容易切割到内部钢筋条,导致主体结构受损的可能性发生。
The invention relates to the technical field of house building construction, and discloses a house building pile foundation construction method which comprises the steps that S1, a site is leveled, specifically, the site is leveled according to the regional position and size of a construction drawing corresponding to an actual construction site; s2, a mud pit is arranged, the mud pit is designed and excavated according to the operation area, and the mud pit is divided into a settling pond and a mud storage pond; S3, surveying and setting out are conducted, and setting out and positioning are conducted according to the requirements of a construction drawing. When a pile head is subjected to ring cutting, the pile head can enter through the notch in the bottom plate, after the pile head enters, the height of the platform plate can be flexibly adjusted and controlled through the hydraulic rod so as to meet different ring cutting height requirements, and when ring cutting work is carried out, the cutting depth in the cutting mechanism is adjusted, the cutting depth can be controlled, precise cutting is achieved, and the cutting efficiency is improved. And the possibility that the main body structure is damaged due to the fact that the cutting precision cannot be guaranteed by manual cutting and internal reinforcing bars are easily cut can be effectively avoided.
本申请涉及房建施工技术领域,且公开了一种房建桩基的施工方法,包括S1.场地平整,按照施工图纸对应实际施工场地的区域位置和大小,并对场地进行平整;S2.设置泥浆池,根据作业区进行设计并开挖泥浆池,且泥浆池应划分为沉淀池和储浆池:S3.测量放线,按照施工图纸要求进行放线定位。在对桩头进行环切时,通过底板上的缺口可供桩头进入,并且在进入后,通过液压杆可灵活调控平台板的高度,以应对不同的环切高度需求,并且在环切工作进行的时候,通过对切割机构中的切割深度进行调节,可控制切割深度,实现精准切割,可有效避免由人工切割而无法保证切割精度,容易切割到内部钢筋条,导致主体结构受损的可能性发生。
Construction method of house building pile foundation
一种房建桩基的施工方法
2023-05-09