Construction method for hoisting and laying bridge prefabricated panel on detachable steel platform
The invention relates to a construction method for hoisting and laying a bridge prefabricated panel on a detachable steel platform, and relates to the technical field of bridge construction, the construction method comprises the following construction steps: building steel platforms: hoisting at least two steel platforms to place on a pile foundation; the adjacent steel platforms are spliced for standby application; the transporting part is hoisted to be placed on the steel platform, and the prefabricated panel is hoisted through the transporting part to be laid on the pile foundation; the steel platform located on one side of the paved prefabricated panel is disassembled, and then the disassembled steel platform is assembled to the other side of the undisassembled steel platform so that the transportation part can move on the adjacent pile foundation and the prefabricated panel can be paved; the prefabricated panel is hoisted and laid on the pile foundation, and the prefabricated panel is laid at the top of the pile foundation and located in the area between the overwater steel trestle and the laid prefabricated panel. The construction method has the effects of reducing blockage of the overwater steel trestle and guaranteeing the paving efficiency of the prefabricated panel on the pile foundation.
本申请涉及可拆装式钢平台上吊装铺设桥梁预制面板的施工方法,涉及桥梁施工技术领域,施工方法包括如下施工步骤:搭建钢平台:吊运至少两个钢平台以放置于桩基础上;拼装相邻的钢平台,以备用;预制面板铺装:吊运运输件以放置于钢平台上,通过运输件吊运预制面板以铺装于桩基础上;递进铺装:拆卸位于已铺装预制面板一侧的钢平台,再将拆卸的钢平台拼装于未拆卸的钢平台的另一侧,以供运输件在相邻的桩基础上位移并铺装预制面板;收尾铺装:吊运预制面板铺装于桩基础上,使桩基础顶部且位于水上钢栈桥和已铺装预制面板之间的区域完成预制面板的铺装。本申请具有减少水上钢栈桥堵塞,保障预制面板在桩基础上的铺装效率的效果。
Construction method for hoisting and laying bridge prefabricated panel on detachable steel platform
The invention relates to a construction method for hoisting and laying a bridge prefabricated panel on a detachable steel platform, and relates to the technical field of bridge construction, the construction method comprises the following construction steps: building steel platforms: hoisting at least two steel platforms to place on a pile foundation; the adjacent steel platforms are spliced for standby application; the transporting part is hoisted to be placed on the steel platform, and the prefabricated panel is hoisted through the transporting part to be laid on the pile foundation; the steel platform located on one side of the paved prefabricated panel is disassembled, and then the disassembled steel platform is assembled to the other side of the undisassembled steel platform so that the transportation part can move on the adjacent pile foundation and the prefabricated panel can be paved; the prefabricated panel is hoisted and laid on the pile foundation, and the prefabricated panel is laid at the top of the pile foundation and located in the area between the overwater steel trestle and the laid prefabricated panel. The construction method has the effects of reducing blockage of the overwater steel trestle and guaranteeing the paving efficiency of the prefabricated panel on the pile foundation.
本申请涉及可拆装式钢平台上吊装铺设桥梁预制面板的施工方法,涉及桥梁施工技术领域,施工方法包括如下施工步骤:搭建钢平台:吊运至少两个钢平台以放置于桩基础上;拼装相邻的钢平台,以备用;预制面板铺装:吊运运输件以放置于钢平台上,通过运输件吊运预制面板以铺装于桩基础上;递进铺装:拆卸位于已铺装预制面板一侧的钢平台,再将拆卸的钢平台拼装于未拆卸的钢平台的另一侧,以供运输件在相邻的桩基础上位移并铺装预制面板;收尾铺装:吊运预制面板铺装于桩基础上,使桩基础顶部且位于水上钢栈桥和已铺装预制面板之间的区域完成预制面板的铺装。本申请具有减少水上钢栈桥堵塞,保障预制面板在桩基础上的铺装效率的效果。
Construction method for hoisting and laying bridge prefabricated panel on detachable steel platform
可拆装式钢平台上吊装铺设桥梁预制面板的施工方法
ZHAO DONGDONG (author) / CHEN XIAOCHUAN (author) / JIANG BIAO (author) / XIA YUANBIN (author) / TONG WENZHONG (author) / LI SHIPENG (author)
2023-05-16
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Detachable hoisting device and method for prefabricated structure
European Patent Office | 2024
|Prefabricated bridge pier stud hoisting device and hoisting method
European Patent Office | 2020
|European Patent Office | 2022
|