A platform for research: civil engineering, architecture and urbanism
Construction method of ground overhead structure
The invention relates to the technical field of ground overhead structure construction, and discloses a method for constructing a ground overhead structure, which comprises the following steps: S1, ground cleaning: firstly, cleaning a to-be-constructed area of the ground overhead structure; s2, supporting piece installation, wherein an installation starting point is established, and a supporting assembly is installed; s3, supporting piece leveling is conducted, specifically, a threaded rod in a supporting assembly is rotated to drive a containing assembly to ascend and descend to the designated height; s4, plate installation; the ground overhead structure is very convenient to build, the method is the same as a conventional ground overhead structure building method, the supporting assembly needs to be fixed to the ground firstly during building, but follow-up building is different from conventional ground overhead structure building, the supporting plate is directly placed on the containing assembly on the supporting assembly, and the ground overhead structure is very convenient to construct. And then the supporting plate can be fixed by clamping the butt joint block with the clamping block, the supporting plate and the supporting assembly can be fixed together without using tools such as a screwdriver, and time and labor are saved during installation.
本发明涉及地面架空结构施工技术领域,公开了一种地面架空结构的搭建方法,包括以下步骤:S1、地面清理:先对地面架空结构所需搭建的区域进行清理;S2、支撑件安装:建立安装起始点将支撑组件安装好;S3、支撑件调平:转动支撑组件中的螺纹杆带动容纳组件升降至指定高度;S4、板块安装;本发明中的地面架空结构在搭建时十分方便,与常规的地面架空结构搭建方法一样,本发明在搭建时也需要先将支撑组件固定在地面上,但是后续的搭建与常规的地面架空结构搭建有所区别,直接将支撑板放置支撑组件上的容纳组件上,随后通过对接块卡合卡接块即可完成支撑板的固定,不需要使用到螺丝刀等工具即可将支撑板与支撑组件固定在一起,安装起来省时省力。
Construction method of ground overhead structure
The invention relates to the technical field of ground overhead structure construction, and discloses a method for constructing a ground overhead structure, which comprises the following steps: S1, ground cleaning: firstly, cleaning a to-be-constructed area of the ground overhead structure; s2, supporting piece installation, wherein an installation starting point is established, and a supporting assembly is installed; s3, supporting piece leveling is conducted, specifically, a threaded rod in a supporting assembly is rotated to drive a containing assembly to ascend and descend to the designated height; s4, plate installation; the ground overhead structure is very convenient to build, the method is the same as a conventional ground overhead structure building method, the supporting assembly needs to be fixed to the ground firstly during building, but follow-up building is different from conventional ground overhead structure building, the supporting plate is directly placed on the containing assembly on the supporting assembly, and the ground overhead structure is very convenient to construct. And then the supporting plate can be fixed by clamping the butt joint block with the clamping block, the supporting plate and the supporting assembly can be fixed together without using tools such as a screwdriver, and time and labor are saved during installation.
本发明涉及地面架空结构施工技术领域,公开了一种地面架空结构的搭建方法,包括以下步骤:S1、地面清理:先对地面架空结构所需搭建的区域进行清理;S2、支撑件安装:建立安装起始点将支撑组件安装好;S3、支撑件调平:转动支撑组件中的螺纹杆带动容纳组件升降至指定高度;S4、板块安装;本发明中的地面架空结构在搭建时十分方便,与常规的地面架空结构搭建方法一样,本发明在搭建时也需要先将支撑组件固定在地面上,但是后续的搭建与常规的地面架空结构搭建有所区别,直接将支撑板放置支撑组件上的容纳组件上,随后通过对接块卡合卡接块即可完成支撑板的固定,不需要使用到螺丝刀等工具即可将支撑板与支撑组件固定在一起,安装起来省时省力。
Construction method of ground overhead structure
一种地面架空结构的搭建方法
SHI ZHIQIANG (author) / WANG TONGJIANG (author) / KANETOSHI (author)
2023-05-16
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Overhead ground adjusting foot and overhead ground construction technology
European Patent Office | 2022
|Construction method of overhead corridor and overhead corridor structure
European Patent Office | 2021
|