A platform for research: civil engineering, architecture and urbanism
Energy dissipation well construction method and energy dissipation well foundation structure
The invention relates to the technical field of building construction, and discloses an energy dissipation well construction method and an energy dissipation well foundation structure, the energy dissipation well foundation structure comprises a plate, a plurality of through holes are formed in the plate, the plate is used for being arranged in a vertical shaft, and an included angle is formed between the plate and the central axis of the vertical shaft; the plate is arranged in the energy dissipation well unit, the energy dissipation well unit is used for being arranged in the vertical shaft along the central axis of the vertical shaft so as to assist installation of the plate, the energy dissipation well unit comprises a column casing structure with two open ends, the plate is arranged in the column casing structure, and an included angle is formed between the plate and the central axis of the column casing structure; one end of the plate is hinged to the inner wall of the column casing structure, and the other end of the plate is hinged to the first connecting plate. The method has the technical effects that the energy dissipation effect can be matched according to scenes, the building can be changed after being completed, a shaft can be reserved for post-construction, and the construction period cannot be delayed.
本发明涉及建筑施工技术领域,公开了一种消能井施工方法及消能井基础结构,包括有板件,板件上开设有若干通孔,用于布设在竖井内,并与竖井的中心轴线呈夹角设置;还包括消能井单元,板件置于消能井单元内,消能井单元用于沿竖井的中心轴线布设在竖井中,以辅助板件的安装,消能井单元包括有:两端开口的柱筒结构,板件置于柱筒结构内,与柱筒结构的中心轴线呈夹角设置;以及第一连接板,板件的一端与柱筒结构的内壁之间铰接,另一端与第一连接板铰接。本发明具有可以根据场景匹配消能效果、建筑完成后可以更改,可以预留井道进行后施工,不会导致工期延误的技术效果。
Energy dissipation well construction method and energy dissipation well foundation structure
The invention relates to the technical field of building construction, and discloses an energy dissipation well construction method and an energy dissipation well foundation structure, the energy dissipation well foundation structure comprises a plate, a plurality of through holes are formed in the plate, the plate is used for being arranged in a vertical shaft, and an included angle is formed between the plate and the central axis of the vertical shaft; the plate is arranged in the energy dissipation well unit, the energy dissipation well unit is used for being arranged in the vertical shaft along the central axis of the vertical shaft so as to assist installation of the plate, the energy dissipation well unit comprises a column casing structure with two open ends, the plate is arranged in the column casing structure, and an included angle is formed between the plate and the central axis of the column casing structure; one end of the plate is hinged to the inner wall of the column casing structure, and the other end of the plate is hinged to the first connecting plate. The method has the technical effects that the energy dissipation effect can be matched according to scenes, the building can be changed after being completed, a shaft can be reserved for post-construction, and the construction period cannot be delayed.
本发明涉及建筑施工技术领域,公开了一种消能井施工方法及消能井基础结构,包括有板件,板件上开设有若干通孔,用于布设在竖井内,并与竖井的中心轴线呈夹角设置;还包括消能井单元,板件置于消能井单元内,消能井单元用于沿竖井的中心轴线布设在竖井中,以辅助板件的安装,消能井单元包括有:两端开口的柱筒结构,板件置于柱筒结构内,与柱筒结构的中心轴线呈夹角设置;以及第一连接板,板件的一端与柱筒结构的内壁之间铰接,另一端与第一连接板铰接。本发明具有可以根据场景匹配消能效果、建筑完成后可以更改,可以预留井道进行后施工,不会导致工期延误的技术效果。
Energy dissipation well construction method and energy dissipation well foundation structure
一种消能井施工方法及消能井基础结构
XIANG LONGKANG (author)
2023-05-23
Patent
Electronic Resource
Chinese
Energy dissipation groove for energy dissipation well and energy dissipation well
European Patent Office | 2021
|Multi-unit energy dissipation type drainage energy dissipation well
European Patent Office | 2024
|Multi-stage energy dissipation type drainage energy dissipation well
European Patent Office | 2023
|