The invention relates to an abandoned mine steep face slope greening system and a construction method thereof. The scheme comprises the following steps that S00, a slope of an abandoned mine is cut; s10, constructing a bottom buried drainage ditch; s20, anchor rod construction is conducted; s30, the integrally-shaped light steel frame body is installed; s40, constructing an ecological bag cofferdam; s50, backfilling soil construction is carried out; s60, mounting a plastic coated net; s70, planting trees; and S80, installing the rainwater-washing-preventing flow guide plate. The problems of quick fixation and sliding collapse of the ecological bag are effectively solved by adopting the integral type shaping light steel frame body, effective fixation of the ecological bag and the slope body is ensured, the construction speed is high, the abandoned mine greening effect is prominent, remarkable economic, environment-friendly and social benefits are achieved, and good application and popularization prospects are achieved.
本申请涉及废弃矿山陡立面边坡复绿体系及其施工方法,该方案包括以下步骤:S00、废弃矿山削坡;S10、底部暗埋式排水沟施工;S20、锚杆施工;S30、整体塑形轻钢架体安装;S40、生态袋围堰施工;S50、回填土施工;S60、包塑网安装;S70、种植树木;S80、防雨水冲刷导流板安装。本申请采用整体式塑形轻钢架体有效解决了在生态袋快速固定及滑动坍塌的难题,并保证了生态袋与坡体的有效固定,具有施工速度快、废弃矿山复绿效果突出,取得了显著的经济、环保和社会效益,具有较好的推广应用前景。
Waste mine steep face slope greening system and construction method thereof
The invention relates to an abandoned mine steep face slope greening system and a construction method thereof. The scheme comprises the following steps that S00, a slope of an abandoned mine is cut; s10, constructing a bottom buried drainage ditch; s20, anchor rod construction is conducted; s30, the integrally-shaped light steel frame body is installed; s40, constructing an ecological bag cofferdam; s50, backfilling soil construction is carried out; s60, mounting a plastic coated net; s70, planting trees; and S80, installing the rainwater-washing-preventing flow guide plate. The problems of quick fixation and sliding collapse of the ecological bag are effectively solved by adopting the integral type shaping light steel frame body, effective fixation of the ecological bag and the slope body is ensured, the construction speed is high, the abandoned mine greening effect is prominent, remarkable economic, environment-friendly and social benefits are achieved, and good application and popularization prospects are achieved.
本申请涉及废弃矿山陡立面边坡复绿体系及其施工方法,该方案包括以下步骤:S00、废弃矿山削坡;S10、底部暗埋式排水沟施工;S20、锚杆施工;S30、整体塑形轻钢架体安装;S40、生态袋围堰施工;S50、回填土施工;S60、包塑网安装;S70、种植树木;S80、防雨水冲刷导流板安装。本申请采用整体式塑形轻钢架体有效解决了在生态袋快速固定及滑动坍塌的难题,并保证了生态袋与坡体的有效固定,具有施工速度快、废弃矿山复绿效果突出,取得了显著的经济、环保和社会效益,具有较好的推广应用前景。
Waste mine steep face slope greening system and construction method thereof
废弃矿山陡立面边坡复绿体系及其施工方法
ZHAN WANGMEI (author) / ZHOU ZIRONG (author) / WU JIAYOU (author) / CHEN CHEN (author) / LI YUEBAO (author) / LI FASHENG (author) / ZHANG TAIWU (author) / LIN SONG (author)
2023-05-23
Patent
Electronic Resource
Chinese
High and steep rock slope greening structure for mine greening
European Patent Office | 2021
|High and steep slope ecological greening device for green mine construction
European Patent Office | 2024
|Steep face slope net cover ecological bag cofferdam greening system and construction method thereof
European Patent Office | 2023
|High and steep rock slope ecological greening method for green mine construction
European Patent Office | 2021
|Steep slope surface reinforcing and greening system and construction method thereof
European Patent Office | 2021
|