Temporary operation platform for bridge pier column construction
The temporary operation platform for bridge pier column construction comprises a bottom layer platform and a plurality of upper layer platforms, the bottom layer platform and the upper layer platforms are sequentially arranged from bottom to top to form a multi-layer temporary operation platform, and operators are borne through a bottom layer bearing assembly and a plurality of upper layer bearing assemblies; the bottom layer support is an integral support formed by welding and surrounds the pier column, the upper layer support is integrally welded with the bottom layer platform or the upper layer platform located on the lower layer of the upper layer support and surrounds the pier column, and therefore the stability of the temporary operation platform is guaranteed, and the operation efficiency is greatly improved. Potential safety hazards are reduced. The problems that an existing scaffold type operation platform greatly limits the number of operators, certain potential safety hazards exist, and the pier column construction efficiency and cost are seriously affected are solved.
本申请提供一种桥梁墩柱施工用临时作业平台,包括底层平台和若干上层平台,所述底层平台和若干所述上层平台由下至上依次排布构成多层临时作业平台,通过底层承载组件和若干个上层承载组件承载作业人员,实现多名作业人员同时多层作业,极大的提高了作业效率,降低了施工成本,并且,底层支架为焊接而成的整体式支架,并围绕墩柱,上层支架与位于其下层的底层平台或上层平台焊接位一体,并围绕墩柱,从而保证临时作业平台的稳定性,降低安全隐患。解决了现今脚手架式作业平台,对作业人员数量限制较大,且存在一定的安全隐患,严重影响墩柱施工效率及成本的问题。
Temporary operation platform for bridge pier column construction
The temporary operation platform for bridge pier column construction comprises a bottom layer platform and a plurality of upper layer platforms, the bottom layer platform and the upper layer platforms are sequentially arranged from bottom to top to form a multi-layer temporary operation platform, and operators are borne through a bottom layer bearing assembly and a plurality of upper layer bearing assemblies; the bottom layer support is an integral support formed by welding and surrounds the pier column, the upper layer support is integrally welded with the bottom layer platform or the upper layer platform located on the lower layer of the upper layer support and surrounds the pier column, and therefore the stability of the temporary operation platform is guaranteed, and the operation efficiency is greatly improved. Potential safety hazards are reduced. The problems that an existing scaffold type operation platform greatly limits the number of operators, certain potential safety hazards exist, and the pier column construction efficiency and cost are seriously affected are solved.
本申请提供一种桥梁墩柱施工用临时作业平台,包括底层平台和若干上层平台,所述底层平台和若干所述上层平台由下至上依次排布构成多层临时作业平台,通过底层承载组件和若干个上层承载组件承载作业人员,实现多名作业人员同时多层作业,极大的提高了作业效率,降低了施工成本,并且,底层支架为焊接而成的整体式支架,并围绕墩柱,上层支架与位于其下层的底层平台或上层平台焊接位一体,并围绕墩柱,从而保证临时作业平台的稳定性,降低安全隐患。解决了现今脚手架式作业平台,对作业人员数量限制较大,且存在一定的安全隐患,严重影响墩柱施工效率及成本的问题。
Temporary operation platform for bridge pier column construction
一种桥梁墩柱施工用临时作业平台
ZHANG ZHIGANG (author) / LI ZHUOHAO (author) / MA JIANLEI (author) / YOSHITO (author) / MA ZIHAN (author)
2023-05-30
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Bridge pier column moving operation platform and construction method
European Patent Office | 2023
|Bridge pier column construction platform and construction method
European Patent Office | 2023
|Bridge pier hanging fence construction operation platform
European Patent Office | 2023
|Climbing operation device for bridge pier column construction
European Patent Office | 2024
|