A platform for research: civil engineering, architecture and urbanism
Annular platform for bridge pier column construction
The invention relates to an annular platform for bridge pier column construction. The annular platform comprises a mounting base, the mounting base comprises a first mounting plate and a second mounting plate, one end of the first mounting plate is hinged to one end of the second mounting plate, and the other end of the first mounting plate is connected with the other end of the second mounting plate through a first locking assembly; at least four self-locking universal wheels are arranged at the bottom of the first mounting plate and the bottom of the second mounting plate, arc grooves matched with the side wall of the pier column body are formed in the opposite side walls of the first mounting plate and the second mounting plate, and a lifting table is arranged on the mounting base and comprises a first lifting plate and a second lifting plate. The first lifting plate and the second lifting plate are both arranged in an arc shape, the first lifting plate is arranged on the first mounting plate, the second lifting plate is arranged on the second mounting plate, the first lifting plate and the second lifting plate are connected through a second locking assembly, and a lifting assembly for driving the lifting table to move up and down is arranged on the mounting base. The annular platform has the effect of accelerating the construction progress.
本申请涉及一种用于桥梁墩柱施工的环向平台,其包括安装底座,安装底座包括第一安装板和第二安装板,第一安装板的一端与第二安装板的一端铰接,第一安装板另一端通过第一锁紧组件与第二安装板的另一端连接,第一安装板和第二安装板的底部设置有至少四个自锁万向轮,第一安装板和第二安装板相对的侧壁开设有与桥墩柱本体侧壁适配的圆弧槽,安装底座上设有升降台,升降台包括第一升降板和第二升降板,第一升降板和第二升降板均呈弧形设置,第一升降板设置在第一安装板,第二升降板设置在第二安装板,第一升降板和第二升降板通过第二锁紧组件连接,安装座上设有驱动升降台上下移动的升降组件。本申请具有加快施工进度的效果。
Annular platform for bridge pier column construction
The invention relates to an annular platform for bridge pier column construction. The annular platform comprises a mounting base, the mounting base comprises a first mounting plate and a second mounting plate, one end of the first mounting plate is hinged to one end of the second mounting plate, and the other end of the first mounting plate is connected with the other end of the second mounting plate through a first locking assembly; at least four self-locking universal wheels are arranged at the bottom of the first mounting plate and the bottom of the second mounting plate, arc grooves matched with the side wall of the pier column body are formed in the opposite side walls of the first mounting plate and the second mounting plate, and a lifting table is arranged on the mounting base and comprises a first lifting plate and a second lifting plate. The first lifting plate and the second lifting plate are both arranged in an arc shape, the first lifting plate is arranged on the first mounting plate, the second lifting plate is arranged on the second mounting plate, the first lifting plate and the second lifting plate are connected through a second locking assembly, and a lifting assembly for driving the lifting table to move up and down is arranged on the mounting base. The annular platform has the effect of accelerating the construction progress.
本申请涉及一种用于桥梁墩柱施工的环向平台,其包括安装底座,安装底座包括第一安装板和第二安装板,第一安装板的一端与第二安装板的一端铰接,第一安装板另一端通过第一锁紧组件与第二安装板的另一端连接,第一安装板和第二安装板的底部设置有至少四个自锁万向轮,第一安装板和第二安装板相对的侧壁开设有与桥墩柱本体侧壁适配的圆弧槽,安装底座上设有升降台,升降台包括第一升降板和第二升降板,第一升降板和第二升降板均呈弧形设置,第一升降板设置在第一安装板,第二升降板设置在第二安装板,第一升降板和第二升降板通过第二锁紧组件连接,安装座上设有驱动升降台上下移动的升降组件。本申请具有加快施工进度的效果。
Annular platform for bridge pier column construction
一种用于桥梁墩柱施工的环向平台
DU HAIYUN (author) / ZHAO XIUJUAN (author) / WANG YONG (author) / SUN GUANGQIU (author) / SUN JIANWEN (author)
2021-09-07
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Annular platform for bridge pier column construction and construction method
European Patent Office | 2024
|Bridge pier column construction platform and construction method
European Patent Office | 2023
|Annular platform for bridge pier stud construction and construction method
European Patent Office | 2015
|Temporary operation platform for bridge pier column construction
European Patent Office | 2023
|