A platform for research: civil engineering, architecture and urbanism
Water conservancy slope protection construction method
The invention discloses a water conservancy slope protection construction method which comprises the following steps that firstly, a prototype of a slope body is excavated through an excavator, and finishing is completed; secondly, sawtooth groove anti-disengaging sliding rails are laid on the top and the bottom of the trimmed slope body, a paving mechanism is installed on the two sawtooth groove anti-disengaging sliding rails, after the paving mechanism is installed, an intelligent controller is electrically connected with an external power source, and parameter setting work is conducted on the intelligent controller; two first servo motors are controlled by an intelligent controller to intermittently work, so that a paving mechanism intermittently slides on two sawtooth groove anti-falling sliding rails, meanwhile, two second servo motors are controlled by the intelligent controller to intermittently work, so that a paving assembly intermittently slides up and down in a reciprocating mode on a paving frame, and the paving efficiency is improved. And the laying assembly can conveniently lay the grass planting slope protection bricks in the slope protection brick storage box on the slope surface of the slope body, the laying efficiency is improved, and the physical strength of workers is saved.
本发明公开水利护坡施工方法,包括以下步骤:步骤一:先通过挖掘机,挖掘出坡体的雏形,并完成修整;步骤二:在修整后的坡体的顶部和底部铺设锯齿槽防脱滑轨,并将摊铺机构安装在两个锯齿槽防脱滑轨上,安装好摊铺机构之后,将智能控制器与外部电源进行电连接,并对智能控制器进行参数设定工作;通过智能控制器控制两个第一伺服电机间歇性地进行工作,就会使得摊铺机构在两个锯齿槽防脱滑轨上间歇性滑动,同时,通过智能控制器控制两个第二伺服电机间歇性地进行工作,使得铺设组件在铺物架上间歇性地进行上下往复滑动,方便铺设组件将护坡砖储存盒内部的植草护坡砖铺设在坡体的斜坡面上,提高铺设效率,节约工作人员的体力。
Water conservancy slope protection construction method
The invention discloses a water conservancy slope protection construction method which comprises the following steps that firstly, a prototype of a slope body is excavated through an excavator, and finishing is completed; secondly, sawtooth groove anti-disengaging sliding rails are laid on the top and the bottom of the trimmed slope body, a paving mechanism is installed on the two sawtooth groove anti-disengaging sliding rails, after the paving mechanism is installed, an intelligent controller is electrically connected with an external power source, and parameter setting work is conducted on the intelligent controller; two first servo motors are controlled by an intelligent controller to intermittently work, so that a paving mechanism intermittently slides on two sawtooth groove anti-falling sliding rails, meanwhile, two second servo motors are controlled by the intelligent controller to intermittently work, so that a paving assembly intermittently slides up and down in a reciprocating mode on a paving frame, and the paving efficiency is improved. And the laying assembly can conveniently lay the grass planting slope protection bricks in the slope protection brick storage box on the slope surface of the slope body, the laying efficiency is improved, and the physical strength of workers is saved.
本发明公开水利护坡施工方法,包括以下步骤:步骤一:先通过挖掘机,挖掘出坡体的雏形,并完成修整;步骤二:在修整后的坡体的顶部和底部铺设锯齿槽防脱滑轨,并将摊铺机构安装在两个锯齿槽防脱滑轨上,安装好摊铺机构之后,将智能控制器与外部电源进行电连接,并对智能控制器进行参数设定工作;通过智能控制器控制两个第一伺服电机间歇性地进行工作,就会使得摊铺机构在两个锯齿槽防脱滑轨上间歇性滑动,同时,通过智能控制器控制两个第二伺服电机间歇性地进行工作,使得铺设组件在铺物架上间歇性地进行上下往复滑动,方便铺设组件将护坡砖储存盒内部的植草护坡砖铺设在坡体的斜坡面上,提高铺设效率,节约工作人员的体力。
Water conservancy slope protection construction method
水利护坡施工方法
YAN JIANBING (author) / LI CHUNJI (author) / MENG YUEJIAO (author) / XU YUANXIN (author) / WANG GANG (author)
2023-06-02
Patent
Electronic Resource
Chinese