A platform for research: civil engineering, architecture and urbanism
Steel-concrete fabricated building and construction method
The invention relates to the technical field of fabricated buildings, in particular to a steel-concrete fabricated building and a construction method.The steel-concrete fabricated building comprises two prefabricated part bodies arranged in a spaced mode, profile steel is installed between the two prefabricated part bodies, a mounting plate is arranged on the sides, close to the profile steel, of the prefabricated part bodies, and a supporting seat is arranged on the mounting plate; guide plates are arranged on the two sides of the supporting base correspondingly and arranged on the side, close to the profile steel, of the supporting base, the ends, away from the supporting base, of the guide plates on the two sides of the supporting base are obliquely arranged in the direction away from the profile steel, and the end of the profile steel and the mounting plate are arranged at intervals. The supporting seat is provided with a limiting assembly used for fixing the profile steel to the supporting seat in advance, the supporting seat is provided with a fixing bolt, and the fixing bolt sequentially penetrates through the profile steel and the supporting seat to be matched with a nut to fix the profile steel. The construction method has the effect of improving the construction efficiency.
本申请涉及装配式建筑的技术领域,尤其是涉及一种钢混装配式建筑及施工方法,包括两个间隔设置的预制件本体,在两个预制件本体之间安装有型钢,所述预制件本体靠近型钢的一侧设置有安装板,所述安装板上设置有支撑座,所述支撑座的两侧分别设置有引导板,所述引导板设置在支撑座靠近型钢的一侧,所述支撑座两侧的引导板背离支撑座的一端沿远离型钢的方向倾斜设置,所述型钢的端部和安装板间隔设置,所述支撑座上设置有用于将型钢预固定在支撑座上的限位组件,所述支撑座上设置有固定螺栓,所述固定螺栓依次穿过型钢和支撑座配合螺母对型钢进行固定。本申请具有提升施工效率的效果。
Steel-concrete fabricated building and construction method
The invention relates to the technical field of fabricated buildings, in particular to a steel-concrete fabricated building and a construction method.The steel-concrete fabricated building comprises two prefabricated part bodies arranged in a spaced mode, profile steel is installed between the two prefabricated part bodies, a mounting plate is arranged on the sides, close to the profile steel, of the prefabricated part bodies, and a supporting seat is arranged on the mounting plate; guide plates are arranged on the two sides of the supporting base correspondingly and arranged on the side, close to the profile steel, of the supporting base, the ends, away from the supporting base, of the guide plates on the two sides of the supporting base are obliquely arranged in the direction away from the profile steel, and the end of the profile steel and the mounting plate are arranged at intervals. The supporting seat is provided with a limiting assembly used for fixing the profile steel to the supporting seat in advance, the supporting seat is provided with a fixing bolt, and the fixing bolt sequentially penetrates through the profile steel and the supporting seat to be matched with a nut to fix the profile steel. The construction method has the effect of improving the construction efficiency.
本申请涉及装配式建筑的技术领域,尤其是涉及一种钢混装配式建筑及施工方法,包括两个间隔设置的预制件本体,在两个预制件本体之间安装有型钢,所述预制件本体靠近型钢的一侧设置有安装板,所述安装板上设置有支撑座,所述支撑座的两侧分别设置有引导板,所述引导板设置在支撑座靠近型钢的一侧,所述支撑座两侧的引导板背离支撑座的一端沿远离型钢的方向倾斜设置,所述型钢的端部和安装板间隔设置,所述支撑座上设置有用于将型钢预固定在支撑座上的限位组件,所述支撑座上设置有固定螺栓,所述固定螺栓依次穿过型钢和支撑座配合螺母对型钢进行固定。本申请具有提升施工效率的效果。
Steel-concrete fabricated building and construction method
一种钢混装配式建筑及施工方法
ZHANG LINJIANG (author) / LIU SONGYANG (author) / AN KYUNG-KYUNG (author) / XING TINGTING (author) / LU FENGTAO (author) / HOU RUYAN (author) / LI CHENGXIANG (author) / LEI KANG (author)
2023-06-02
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Concrete pouring construction method for fabricated steel structure building foundation
European Patent Office | 2024
|Fabricated steel concrete building main body frame structure and construction method thereof
European Patent Office | 2024
|