A platform for research: civil engineering, architecture and urbanism
Building settlement joint repairing device and construction method
The invention relates to a building settlement joint repairing device which comprises a sleeve, a foldable plate and a double-sided tape, the sleeve can stretch out and draw back in the width direction of the inner wall of a settlement joint, and the two ends of the sleeve abut against the inner wall of the settlement joint to form interference fixation; a foldable plate is arranged on the outer side of the sleeve, and the two sides of the foldable plate are fixed to the inner wall of the settlement joint through double-sided tape. The building settlement joint repairing construction method comprises the following steps that S1, the sleeve is installed on the settlement joint according to the designed position, and the two ends of the sleeve abut against the inner wall of the settlement joint to be fixed; s2, a foldable plate is arranged on the outer side face of the installed sleeve and fixed to the inner wall of the settlement joint through a double-sided tape; s3, after it is determined that the foldable plate is fixed, reinforcing steel bars are distributed on the outer side of the foldable plate, and concrete is poured; and S4, after the concrete strength meets the design requirement, tiles are laid, the settlement joint effect is guaranteed under the condition that the original structural performance is not damaged, and meanwhile the structure can better resist the influences of deformation and settlement.
本申请涉及一种建筑沉降缝修复装置,包括套筒、可折叠板及双面胶带,所述套筒可沿沉降缝内壁宽度方向伸缩,所述套筒以其两端抵住在沉降缝内壁上形成过盈固定;在所述套筒外侧设置可折叠板,所述可折叠板两侧通过双面胶带固定在沉降缝内壁上,本申请还公开一种建筑沉降缝修复施工方法,包括步骤如下:S1、在沉降缝按设计位置安装套筒并转动套筒使其两端抵住在沉降缝内壁上固定;S2、在安装的套筒外侧面设置可折叠板,并用双面胶带固定在沉降缝内壁上;S3、确定可折叠板固定后,在可折叠板外侧下发钢筋并浇筑混凝土;S4、待混凝土强度达到设计要求后铺装瓷砖,在不损害原有结构性能下保证其沉降缝效果,同时使构筑物更能抵抗变形、沉降的影响。
Building settlement joint repairing device and construction method
The invention relates to a building settlement joint repairing device which comprises a sleeve, a foldable plate and a double-sided tape, the sleeve can stretch out and draw back in the width direction of the inner wall of a settlement joint, and the two ends of the sleeve abut against the inner wall of the settlement joint to form interference fixation; a foldable plate is arranged on the outer side of the sleeve, and the two sides of the foldable plate are fixed to the inner wall of the settlement joint through double-sided tape. The building settlement joint repairing construction method comprises the following steps that S1, the sleeve is installed on the settlement joint according to the designed position, and the two ends of the sleeve abut against the inner wall of the settlement joint to be fixed; s2, a foldable plate is arranged on the outer side face of the installed sleeve and fixed to the inner wall of the settlement joint through a double-sided tape; s3, after it is determined that the foldable plate is fixed, reinforcing steel bars are distributed on the outer side of the foldable plate, and concrete is poured; and S4, after the concrete strength meets the design requirement, tiles are laid, the settlement joint effect is guaranteed under the condition that the original structural performance is not damaged, and meanwhile the structure can better resist the influences of deformation and settlement.
本申请涉及一种建筑沉降缝修复装置,包括套筒、可折叠板及双面胶带,所述套筒可沿沉降缝内壁宽度方向伸缩,所述套筒以其两端抵住在沉降缝内壁上形成过盈固定;在所述套筒外侧设置可折叠板,所述可折叠板两侧通过双面胶带固定在沉降缝内壁上,本申请还公开一种建筑沉降缝修复施工方法,包括步骤如下:S1、在沉降缝按设计位置安装套筒并转动套筒使其两端抵住在沉降缝内壁上固定;S2、在安装的套筒外侧面设置可折叠板,并用双面胶带固定在沉降缝内壁上;S3、确定可折叠板固定后,在可折叠板外侧下发钢筋并浇筑混凝土;S4、待混凝土强度达到设计要求后铺装瓷砖,在不损害原有结构性能下保证其沉降缝效果,同时使构筑物更能抵抗变形、沉降的影响。
Building settlement joint repairing device and construction method
一种建筑沉降缝修复装置及施工方法
LIN RONGHUI (author) / TU BINGXIONG (author) / GAO RUIYANG (author) / WU YUHAO (author)
2023-06-02
Patent
Electronic Resource
Chinese
Culvert settlement joint water seepage repairing structure and method for repairing settlement joint
European Patent Office | 2021
|Existing building differential settlement repairing structure and repairing method thereof
European Patent Office | 2023
|Ancient building frame beam splitting settlement repairing device and repairing method thereof
European Patent Office | 2024
|Concrete construction joint repairing device and repairing method
European Patent Office | 2023
|Building protection repairing construction device and repairing method
European Patent Office | 2023
|