A platform for research: civil engineering, architecture and urbanism
Concrete construction joint repairing device and repairing method
The invention relates to the technical field of concrete construction, in particular to a concrete construction joint repairing device and method.The concrete construction joint repairing device comprises a base frame, the top of the base frame is fixedly connected with a supporting frame, the top of the supporting frame is fixedly connected with a storage tank, and the bottom of the storage tank communicates with a guide pipe; the bottom end of the guide pipe penetrates to the bottom of the base frame and is in sliding connection with the base frame. Two mounting assemblies are arranged on the surface of the storage tank; an adjusting assembly is arranged on the rear side of the top of the base frame. The device has the advantages of being high in efficiency and convenient to use, in the actual use process, firstly, crack filling and concrete troweling are conducted on the surface of the base frame step by step, cement troweling is conducted under the movement of the base frame during crack filling, the cement troweling and the cement troweling are conducted at the same time, no conflict exists, the efficiency is higher, and the construction period is shortened. And the whole device is convenient to move, the base frame is vertically pushed to move through matched use of rollers, and the transmission load of a user is relieved.
本发明涉及混凝土施工技术领域,尤其为一种混凝土施工缝修补装置和修补方法,包括:基架,所述基架的顶部固定连接有支撑架,所述支撑架的顶部固定连接有存储罐,所述存储罐的底部连通有导管,所述导管的底端贯穿至基架的底部并与基架滑动连接;所述存储罐的表面设置有两个安装组件;所述基架顶部的后侧设置有调节组件。本发明具备效率高、使用方便的优点,在实际使用过程中,首先通过对裂缝填补和对裂缝填补后混凝土的抹平均安装于基架的表面,两者循序渐进,在对裂缝填补时,在基架的运动下,同时对水泥抹平,两者同时进行,不相冲突,效率更高,且装置整体便于移动,通过滚轮的配合使用,直立推动基架移动,减轻使用者传动负重。
Concrete construction joint repairing device and repairing method
The invention relates to the technical field of concrete construction, in particular to a concrete construction joint repairing device and method.The concrete construction joint repairing device comprises a base frame, the top of the base frame is fixedly connected with a supporting frame, the top of the supporting frame is fixedly connected with a storage tank, and the bottom of the storage tank communicates with a guide pipe; the bottom end of the guide pipe penetrates to the bottom of the base frame and is in sliding connection with the base frame. Two mounting assemblies are arranged on the surface of the storage tank; an adjusting assembly is arranged on the rear side of the top of the base frame. The device has the advantages of being high in efficiency and convenient to use, in the actual use process, firstly, crack filling and concrete troweling are conducted on the surface of the base frame step by step, cement troweling is conducted under the movement of the base frame during crack filling, the cement troweling and the cement troweling are conducted at the same time, no conflict exists, the efficiency is higher, and the construction period is shortened. And the whole device is convenient to move, the base frame is vertically pushed to move through matched use of rollers, and the transmission load of a user is relieved.
本发明涉及混凝土施工技术领域,尤其为一种混凝土施工缝修补装置和修补方法,包括:基架,所述基架的顶部固定连接有支撑架,所述支撑架的顶部固定连接有存储罐,所述存储罐的底部连通有导管,所述导管的底端贯穿至基架的底部并与基架滑动连接;所述存储罐的表面设置有两个安装组件;所述基架顶部的后侧设置有调节组件。本发明具备效率高、使用方便的优点,在实际使用过程中,首先通过对裂缝填补和对裂缝填补后混凝土的抹平均安装于基架的表面,两者循序渐进,在对裂缝填补时,在基架的运动下,同时对水泥抹平,两者同时进行,不相冲突,效率更高,且装置整体便于移动,通过滚轮的配合使用,直立推动基架移动,减轻使用者传动负重。
Concrete construction joint repairing device and repairing method
一种混凝土施工缝修补装置和修补方法
SU ZHIJUN (author) / LI WEI (author) / YU HAIYONG (author) / CHENG CHEN (author) / LIU YIFEI (author) / XIONG WENWU (author) / SONG YANG (author) / LI CHUNWANG (author) / LI PENG (author) / YANG HAIGUANG (author)
2023-07-04
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste