A platform for research: civil engineering, architecture and urbanism
Bridge construction pier body production process
The invention belongs to the technical field of bridge engineering, and particularly relates to a bridge construction pier body production process. The pipe body fixing frame and the vibrating rod hose scale marks are arranged firstly, then the concrete pouring hose and the vibrating rod hose are connected in an inserted mode, then the concrete pouring hose and the vibrating rod hose are lifted upwards in a matched mode, the continuous concrete pouring and vibrating process is finally achieved, and it is guaranteed that bubbles in a pier body are few, the structural integrity is good, and the strength is higher; and the color difference of the appearance is relatively small. In addition, the invention further provides a pipe body fixing frame used in the concrete pouring and vibrating process, the pipe body fixing frame structurally comprises a bottom plate, U-shaped steel, a middle circular ring unit, a side edge bottom plate unit and a supporting rod unit, it is guaranteed that the continuous concrete pouring and vibrating process is more stable and convenient, and in addition, it is guaranteed that a vibrating bar hose is not prone to being bent and damaged during lifting.
本发明属于桥梁工程技术领域,尤其涉及一种桥梁施工墩身生产工艺。本发明通过先设置管体固定架和振动棒软管刻度线,再插接混凝土浇筑软管和振动棒软管,接着相互匹配地向上提升混凝土浇筑软管和振动棒软管,最终实现连续式的混凝土浇筑振捣工艺,保证墩身内气泡少、结构整体性好、强度更大,而且外观色差相对较小。此外,本发明还提供一种上述混凝土浇筑振捣工艺使用的管体固定架,其结构包括底板、U型钢、中部圆环单元、侧边底板单元,以及支撑杆单元,保证连续式的混凝土浇筑振捣工艺更加稳定、便捷,另外保证振动棒软管在提升时不易弯折破损。
Bridge construction pier body production process
The invention belongs to the technical field of bridge engineering, and particularly relates to a bridge construction pier body production process. The pipe body fixing frame and the vibrating rod hose scale marks are arranged firstly, then the concrete pouring hose and the vibrating rod hose are connected in an inserted mode, then the concrete pouring hose and the vibrating rod hose are lifted upwards in a matched mode, the continuous concrete pouring and vibrating process is finally achieved, and it is guaranteed that bubbles in a pier body are few, the structural integrity is good, and the strength is higher; and the color difference of the appearance is relatively small. In addition, the invention further provides a pipe body fixing frame used in the concrete pouring and vibrating process, the pipe body fixing frame structurally comprises a bottom plate, U-shaped steel, a middle circular ring unit, a side edge bottom plate unit and a supporting rod unit, it is guaranteed that the continuous concrete pouring and vibrating process is more stable and convenient, and in addition, it is guaranteed that a vibrating bar hose is not prone to being bent and damaged during lifting.
本发明属于桥梁工程技术领域,尤其涉及一种桥梁施工墩身生产工艺。本发明通过先设置管体固定架和振动棒软管刻度线,再插接混凝土浇筑软管和振动棒软管,接着相互匹配地向上提升混凝土浇筑软管和振动棒软管,最终实现连续式的混凝土浇筑振捣工艺,保证墩身内气泡少、结构整体性好、强度更大,而且外观色差相对较小。此外,本发明还提供一种上述混凝土浇筑振捣工艺使用的管体固定架,其结构包括底板、U型钢、中部圆环单元、侧边底板单元,以及支撑杆单元,保证连续式的混凝土浇筑振捣工艺更加稳定、便捷,另外保证振动棒软管在提升时不易弯折破损。
Bridge construction pier body production process
一种桥梁施工墩身生产工艺
GAO ZEYAN (author) / MEI YUGUANG (author) / YU KAIWEI (author) / ZHOU YUXUAN (author) / TANG LIN (author) / YU BIN (author) / HUANG HUI (author)
2023-06-06
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
PIER, PIER CONSTRUCTION METHOD, BRIDGE RECONSTRUCTION METHOD AND BRIDGE CONSTRUCTION METHOD
European Patent Office | 2021
|