A platform for research: civil engineering, architecture and urbanism
Fabricated shear wall building structure and construction method thereof
The invention discloses a fabricated shear wall building structure and a construction method thereof.The fabricated shear wall building structure comprises a bottom plate, a connecting plate, side plates, a first shear wall and a second shear wall, an abutting mechanism is installed in each side plate and comprises a sliding plate, a first sliding groove used for sliding of the sliding plate is formed in each side plate, and a through hole is formed in one side of each first sliding groove; a moving plate is slidably connected into the through hole, a second sliding groove is formed in the end, away from the sliding plate, of the moving plate, an abutting plate is slidably connected into the second sliding groove, a first spring is fixedly connected to one end of the abutting plate, and the end, away from the abutting plate, of the first spring is fixedly connected to the groove bottom of the second sliding groove; one end, far away from the sliding plate, of the connecting rod is hinged to one side, close to the sliding plate, of the moving plate; a driving piece used for driving the sliding plate to move is installed in the first sliding groove. The possibility that the first shear wall and the second shear wall slide between the two side plates can be reduced.
本发明公开了一种装配式剪力墙建筑结构及其施工方法,其包括底板、连接板、侧板、第一剪力墙以及第二剪力墙,每个侧板内安装有抵接机构,抵接机构包括滑板,侧板内开设有用于供滑板滑移的第一滑槽,第一滑槽的一侧开设有通孔,通孔内滑移连接有移动板,移动板远离滑板的一端开设有第二滑槽,第二滑槽内滑移连接有抵接板,抵接板的一端固接有第一弹簧,第一弹簧远离抵接板的一端固接于第二滑槽的槽底;滑板靠近移动板的一侧铰接有连杆,连杆远离滑板的一端铰接于移动板靠近滑板的一侧;第一滑槽内安装有用于驱动滑板移动的驱动件。本发明能够降低第一剪力墙和第二剪力墙在两个侧板之间发生滑移的可能性。
Fabricated shear wall building structure and construction method thereof
The invention discloses a fabricated shear wall building structure and a construction method thereof.The fabricated shear wall building structure comprises a bottom plate, a connecting plate, side plates, a first shear wall and a second shear wall, an abutting mechanism is installed in each side plate and comprises a sliding plate, a first sliding groove used for sliding of the sliding plate is formed in each side plate, and a through hole is formed in one side of each first sliding groove; a moving plate is slidably connected into the through hole, a second sliding groove is formed in the end, away from the sliding plate, of the moving plate, an abutting plate is slidably connected into the second sliding groove, a first spring is fixedly connected to one end of the abutting plate, and the end, away from the abutting plate, of the first spring is fixedly connected to the groove bottom of the second sliding groove; one end, far away from the sliding plate, of the connecting rod is hinged to one side, close to the sliding plate, of the moving plate; a driving piece used for driving the sliding plate to move is installed in the first sliding groove. The possibility that the first shear wall and the second shear wall slide between the two side plates can be reduced.
本发明公开了一种装配式剪力墙建筑结构及其施工方法,其包括底板、连接板、侧板、第一剪力墙以及第二剪力墙,每个侧板内安装有抵接机构,抵接机构包括滑板,侧板内开设有用于供滑板滑移的第一滑槽,第一滑槽的一侧开设有通孔,通孔内滑移连接有移动板,移动板远离滑板的一端开设有第二滑槽,第二滑槽内滑移连接有抵接板,抵接板的一端固接有第一弹簧,第一弹簧远离抵接板的一端固接于第二滑槽的槽底;滑板靠近移动板的一侧铰接有连杆,连杆远离滑板的一端铰接于移动板靠近滑板的一侧;第一滑槽内安装有用于驱动滑板移动的驱动件。本发明能够降低第一剪力墙和第二剪力墙在两个侧板之间发生滑移的可能性。
Fabricated shear wall building structure and construction method thereof
一种装配式剪力墙建筑结构及其施工方法
LIN PENG (author) / ZHANG LIQIONG (author)
2023-06-06
Patent
Electronic Resource
Chinese
Fabricated shear wall building structure and construction method thereof
European Patent Office | 2023
|Fabricated shear wall building structure and construction method thereof
European Patent Office | 2021
|Shear wall structure based on fabricated building and construction method thereof
European Patent Office | 2023
|Shear wall box type fabricated building structure and construction method thereof
European Patent Office | 2021
|Fabricated concrete shear wall structure and construction method thereof
European Patent Office | 2024
|