A platform for research: civil engineering, architecture and urbanism
Fabricated shear wall building structure and construction method thereof
The invention relates to the technical field of shear walls, in particular to a fabricated shear wall building structure and a construction method thereof.The fabricated shear wall building structure comprises two shear walls, a connecting column is arranged between the two shear walls, an inserting column is slidably arranged on the side wall of the connecting column, and inserting grooves are correspondingly formed in one sides of the two shear walls; the two shear walls are provided with inserting columns, the inserting columns are connected with the inserting grooves in an inserted mode, connecting rods are arranged on the sides, away from the connecting columns, of the inserting columns, connecting grooves are correspondingly formed in the inner walls of the inserting grooves, the connecting rods are connected with the connecting grooves in an inserted mode, fixing frames are poured into the sides, facing the connecting columns, of the two shear walls, and the connecting rods are arranged in the fixing frames in a penetrating mode. The fixing frame is provided with a fixing mechanism used for fixing the connecting rod. The method has the effects that the assembling efficiency of the fabricated shear wall is improved, and the construction period is shortened.
本申请涉及剪力墙的技术领域,尤其是涉及一种装配式剪力墙建筑结构及其施工方法,其包括两面剪力墙,两块所述剪力墙之间设置有连接柱,所述连接柱的侧壁滑动设置有插柱,两块所述剪力墙的一侧对应开设有插槽,所述插柱与所述插槽插接,所述插柱背离所述连接柱的一侧设置有连接杆,所述插槽的内壁对应开设有连接槽,所述连接杆与所述连接槽插接,两块所述剪力墙朝向所述连接柱的一侧的内部浇注有固定架,连接杆穿设于固定架内,所述固定架设置有用于固定所述连接杆的固定机构。本申请具有提高装配式剪力墙的拼装效率,缩短施工工期的效果。
Fabricated shear wall building structure and construction method thereof
The invention relates to the technical field of shear walls, in particular to a fabricated shear wall building structure and a construction method thereof.The fabricated shear wall building structure comprises two shear walls, a connecting column is arranged between the two shear walls, an inserting column is slidably arranged on the side wall of the connecting column, and inserting grooves are correspondingly formed in one sides of the two shear walls; the two shear walls are provided with inserting columns, the inserting columns are connected with the inserting grooves in an inserted mode, connecting rods are arranged on the sides, away from the connecting columns, of the inserting columns, connecting grooves are correspondingly formed in the inner walls of the inserting grooves, the connecting rods are connected with the connecting grooves in an inserted mode, fixing frames are poured into the sides, facing the connecting columns, of the two shear walls, and the connecting rods are arranged in the fixing frames in a penetrating mode. The fixing frame is provided with a fixing mechanism used for fixing the connecting rod. The method has the effects that the assembling efficiency of the fabricated shear wall is improved, and the construction period is shortened.
本申请涉及剪力墙的技术领域,尤其是涉及一种装配式剪力墙建筑结构及其施工方法,其包括两面剪力墙,两块所述剪力墙之间设置有连接柱,所述连接柱的侧壁滑动设置有插柱,两块所述剪力墙的一侧对应开设有插槽,所述插柱与所述插槽插接,所述插柱背离所述连接柱的一侧设置有连接杆,所述插槽的内壁对应开设有连接槽,所述连接杆与所述连接槽插接,两块所述剪力墙朝向所述连接柱的一侧的内部浇注有固定架,连接杆穿设于固定架内,所述固定架设置有用于固定所述连接杆的固定机构。本申请具有提高装配式剪力墙的拼装效率,缩短施工工期的效果。
Fabricated shear wall building structure and construction method thereof
一种装配式剪力墙建筑结构及其施工方法
SU RIQIANG (author) / GAN XIANGHAI (author) / HUANG WENGUANG (author)
2023-09-01
Patent
Electronic Resource
Chinese
Fabricated shear wall building structure and construction method thereof
European Patent Office | 2021
|Fabricated shear wall building structure and construction method thereof
European Patent Office | 2023
|Shear wall structure based on fabricated building and construction method thereof
European Patent Office | 2023
|Shear wall box type fabricated building structure and construction method thereof
European Patent Office | 2021
|Fabricated concrete shear wall structure and construction method thereof
European Patent Office | 2024
|