A platform for research: civil engineering, architecture and urbanism
Socket and spigot type all-round scaffold construction process
The invention discloses a socket type all-round scaffold construction process, and relates to the technical field of scaffold construction processes. In order to facilitate installation, the method comprises the following steps of scaffold material selection; building a scaffold; performing construction; removing the scaffold; checking and accepting; wherein in the step S2, the specific erecting mode of erecting the scaffold comprises the steps of construction preparation and lofting; arranging an adjustable base; mounting a vertical rod and a transverse rod of the first step pitch frame body; the elevation of the adjustable base and the levelness of the frame body are adjusted; inclined rods of the first step pitch frame body are installed; and the second step pitch frame body continues to be installed until the last step pitch frame body is installed. According to the socket type all-round scaffold construction technology, the construction efficiency is high, the erected structure is firm, the influence of the construction technology on the surrounding environment is small, construction is carried out under the factors of environment protection, original structure safety, non-transformation area operation, the influence on the surrounding environment and the like, practicability is high, and reliability is high.
本发明公开了一种承插式满堂脚手架施工工艺,涉及脚手架施工工艺技术领域。为了便于安装,包括如下步骤:脚手架选材;脚手架搭建;施工;脚手架拆除;检查与验收;其中,所述S2步骤中,搭建脚手架的具体搭设方式为:施工准备及放样;排放可调底座;安装第一步距架体的立杆、横杆;调整可调底座标高和架体水平度;安装第一步距架体的斜杆;继续安装第二步距架体,直至最后一步距架体安装完成。本发明的承插式满堂脚手架施工工艺,施工效率高,搭设结构牢固,且该施工工艺对周围环境影响小,综合考虑环境保护、原结构安全、非改造区域运营、对周边环境影响等的因素下进行施工,实用性强,可靠性高。
Socket and spigot type all-round scaffold construction process
The invention discloses a socket type all-round scaffold construction process, and relates to the technical field of scaffold construction processes. In order to facilitate installation, the method comprises the following steps of scaffold material selection; building a scaffold; performing construction; removing the scaffold; checking and accepting; wherein in the step S2, the specific erecting mode of erecting the scaffold comprises the steps of construction preparation and lofting; arranging an adjustable base; mounting a vertical rod and a transverse rod of the first step pitch frame body; the elevation of the adjustable base and the levelness of the frame body are adjusted; inclined rods of the first step pitch frame body are installed; and the second step pitch frame body continues to be installed until the last step pitch frame body is installed. According to the socket type all-round scaffold construction technology, the construction efficiency is high, the erected structure is firm, the influence of the construction technology on the surrounding environment is small, construction is carried out under the factors of environment protection, original structure safety, non-transformation area operation, the influence on the surrounding environment and the like, practicability is high, and reliability is high.
本发明公开了一种承插式满堂脚手架施工工艺,涉及脚手架施工工艺技术领域。为了便于安装,包括如下步骤:脚手架选材;脚手架搭建;施工;脚手架拆除;检查与验收;其中,所述S2步骤中,搭建脚手架的具体搭设方式为:施工准备及放样;排放可调底座;安装第一步距架体的立杆、横杆;调整可调底座标高和架体水平度;安装第一步距架体的斜杆;继续安装第二步距架体,直至最后一步距架体安装完成。本发明的承插式满堂脚手架施工工艺,施工效率高,搭设结构牢固,且该施工工艺对周围环境影响小,综合考虑环境保护、原结构安全、非改造区域运营、对周边环境影响等的因素下进行施工,实用性强,可靠性高。
Socket and spigot type all-round scaffold construction process
一种承插式满堂脚手架施工工艺
WANG CHUANGYE (author) / MA XIAO (author) / ZHANG FUYING (author) / QUAN QINGPENG (author) / YANG RUIZENG (author) / PU YANG (author) / YANG LIPENG (author)
2023-06-06
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Socket and spigot type steel pipe scaffold and construction method thereof
European Patent Office | 2021
|Socket and spigot type pipe gallery scaffold erecting structure and construction method thereof
European Patent Office | 2021
|