A platform for research: civil engineering, architecture and urbanism
Construction method for fixing super high-rise unit type curtain wall stone decoration line
The invention discloses a construction method for fixing a super high-rise unit type curtain wall stone decoration line, which comprises the following steps of: 1, providing a curtain wall stone decoration line (1), and installing a stone line cross beam (3) on the back surface of the curtain wall stone decoration line (1); 2, a decorative framework (5) is arranged on the edge of the curtain wall stone decorative line (1), and the stone decorative line is formed; and 3, the stone decoration lines are hoisted and installed on the building structure through stone line cross beams (3), the stone decoration lines are spliced with the adjacent stone decoration lines and stone curtain wall unit plates through decoration frameworks (5), and an integral stone curtain wall system is formed. The problem that in the prior art, a curtain wall stone decoration line has the potential safety hazard that the stone decoration line falls off and hurts people on a wall can be solved.
本发明公开了一种用于超高层单元式幕墙石材装饰线条固定的施工方法,包括以下步骤:步骤1:提供幕墙石材装饰线条(1),并在幕墙石材装饰线条(1)的背面安装石材线条横梁(3);步骤2:在幕墙石材装饰线条(1)的边缘处设置装饰骨架(5),形成石材装饰线条;步骤3:吊装石材装饰线条并通过石材线条横梁(3)安装在建筑结构上,石材装饰线条通过装饰骨架(5)与相邻的石材装饰线条和石材幕墙单元板块拼接,形成整体的石材幕墙体系。本发明能够解决现有技术中幕墙石材装饰线条上墙存在脱落伤人的安全隐患的问题。
Construction method for fixing super high-rise unit type curtain wall stone decoration line
The invention discloses a construction method for fixing a super high-rise unit type curtain wall stone decoration line, which comprises the following steps of: 1, providing a curtain wall stone decoration line (1), and installing a stone line cross beam (3) on the back surface of the curtain wall stone decoration line (1); 2, a decorative framework (5) is arranged on the edge of the curtain wall stone decorative line (1), and the stone decorative line is formed; and 3, the stone decoration lines are hoisted and installed on the building structure through stone line cross beams (3), the stone decoration lines are spliced with the adjacent stone decoration lines and stone curtain wall unit plates through decoration frameworks (5), and an integral stone curtain wall system is formed. The problem that in the prior art, a curtain wall stone decoration line has the potential safety hazard that the stone decoration line falls off and hurts people on a wall can be solved.
本发明公开了一种用于超高层单元式幕墙石材装饰线条固定的施工方法,包括以下步骤:步骤1:提供幕墙石材装饰线条(1),并在幕墙石材装饰线条(1)的背面安装石材线条横梁(3);步骤2:在幕墙石材装饰线条(1)的边缘处设置装饰骨架(5),形成石材装饰线条;步骤3:吊装石材装饰线条并通过石材线条横梁(3)安装在建筑结构上,石材装饰线条通过装饰骨架(5)与相邻的石材装饰线条和石材幕墙单元板块拼接,形成整体的石材幕墙体系。本发明能够解决现有技术中幕墙石材装饰线条上墙存在脱落伤人的安全隐患的问题。
Construction method for fixing super high-rise unit type curtain wall stone decoration line
用于超高层单元式幕墙石材装饰线条固定的施工方法
HE GUOHUI (author) / LI RONGPENG (author) / LIU PENGPENG (author) / JI BENXIN (author) / YANG QIUSHI (author) / JUNG CHI-JUNG (author) / LU HONGDA (author) / TONG QIANJIANG (author) / MA PENGKE (author) / GAO HAIFENG (author)
2023-06-09
Patent
Electronic Resource
Chinese
Stone curtain wall decoration profile assembly and construction method of stone curtain wall
European Patent Office | 2021
|Super high-rise unit type curtain wall mounting equipment
European Patent Office | 2022
|Combined type unit curtain wall large decoration line system
European Patent Office | 2024
|Construction method and fixing structure of stone curtain wall
European Patent Office | 2024
|Construction method of super high-rise glass curtain wall
European Patent Office | 2023
|