The invention belongs to the technical field of concrete construction, and particularly relates to a modular turnover construction process for concrete slab pouring construction, which comprises the following steps: S1, mutually connecting a pair of long templates and a pair of short templates through a connecting assembly, pouring concrete into closed areas in the templates, and curing to form an initial section concrete slab; s2, the short formwork on one side is detached, the other formworks are integrally and horizontally moved towards the other side, a closed area is formed among the long formworks, the short formworks and the concrete slab, and concrete is poured into the closed area; and S3, construction work of all the sections of the concrete slab is completed in sequence through the operation, the complete concrete slab can be formed, and turnover modular construction is achieved. By means of the construction method, the long concrete slab is divided into a plurality of sections, concrete is poured in sequence, modular construction is achieved, only one-time mounting and dismounting work needs to be conducted on the formwork in the whole process, the formwork can be conveniently transferred and moved on a construction site, and the construction efficiency is improved.
本发明属于混凝土施工技术领域,具体的说是混凝土板浇筑施工用模块化可周转施工工艺,包括S1:通过连接组件将一对长模板和一对短模板之间互相连接,向模板内部的封闭区域浇筑混凝土,养护后形成初段混凝土板;S2:将其中一侧的短模板拆卸,将其余的模板整体向另一侧平移,长模板、短模板与混凝土板之间构成封闭区域,并在该封闭区域内部浇筑混凝土;S3:通过上述操作依次完成混凝土板各个分段的施工工作,即可形成完整的混凝土板,实现可周转模块化施工;通过该施工方法,将较长的混凝土板分隔为若干分段并依次浇筑混凝土,实现模块化施工,全过程中只需对模板进行一次安装拆卸工作,便于模板在施工现场周转移动,提高施工效率。
The invention belongs to the technical field of concrete construction, and particularly relates to a modular turnover construction process for concrete slab pouring construction, which comprises the following steps: S1, mutually connecting a pair of long templates and a pair of short templates through a connecting assembly, pouring concrete into closed areas in the templates, and curing to form an initial section concrete slab; s2, the short formwork on one side is detached, the other formworks are integrally and horizontally moved towards the other side, a closed area is formed among the long formworks, the short formworks and the concrete slab, and concrete is poured into the closed area; and S3, construction work of all the sections of the concrete slab is completed in sequence through the operation, the complete concrete slab can be formed, and turnover modular construction is achieved. By means of the construction method, the long concrete slab is divided into a plurality of sections, concrete is poured in sequence, modular construction is achieved, only one-time mounting and dismounting work needs to be conducted on the formwork in the whole process, the formwork can be conveniently transferred and moved on a construction site, and the construction efficiency is improved.
本发明属于混凝土施工技术领域,具体的说是混凝土板浇筑施工用模块化可周转施工工艺,包括S1:通过连接组件将一对长模板和一对短模板之间互相连接,向模板内部的封闭区域浇筑混凝土,养护后形成初段混凝土板;S2:将其中一侧的短模板拆卸,将其余的模板整体向另一侧平移,长模板、短模板与混凝土板之间构成封闭区域,并在该封闭区域内部浇筑混凝土;S3:通过上述操作依次完成混凝土板各个分段的施工工作,即可形成完整的混凝土板,实现可周转模块化施工;通过该施工方法,将较长的混凝土板分隔为若干分段并依次浇筑混凝土,实现模块化施工,全过程中只需对模板进行一次安装拆卸工作,便于模板在施工现场周转移动,提高施工效率。
Modularized turnover construction process for concrete slab pouring construction
混凝土板浇筑施工用模块化可周转施工工艺
WANG LING (author)
2023-06-13
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Modularized turnover construction process for concrete slab pouring construction
European Patent Office | 2022
|Lower chord plate pouring equipment for arch slab concrete pouring construction
European Patent Office | 2023
|Reserved hole construction method for concrete pouring floor slab
European Patent Office | 2023
|Construction method suitable for dam face slab concrete pouring
European Patent Office | 2021
|European Patent Office | 2015
|