A platform for research: civil engineering, architecture and urbanism
Auxiliary cable hanging system of deck crane and using method of auxiliary cable hanging system
The invention discloses an auxiliary cable hanging system of a bridge deck crane and a using method thereof.The auxiliary cable hanging system is arranged on a rear anchor beam of the bridge deck crane and comprises a connecting base, a main truss and a top truss, the outer side of the top truss is downwards connected with a track beam, a plurality of lifting devices are arranged on the track beam, and by arranging a telescopic stand column with the length changed, the main truss is connected with the main truss; the applicable height of the whole auxiliary cable hanging structure can be flexibly adjusted, bridge floor construction equipment and other working faces can be smoothly avoided, so that beam erecting operation and cable hanging construction do not interfere with each other, a control system is arranged and connected with a rotating motor, a pushing oil cylinder and a lifting device, automatic and remote intelligent operation control over the cable hanging process is achieved, and the construction efficiency is improved. The device is simple in structure and convenient to use, does not mainly depend on artificial experience judgment, improves regulation and control precision of movement of the stay cable, meanwhile, is beneficial for guaranteeing safety and construction efficiency of cable hanging construction, does not need to add other construction machines on a construction site, and effectively saves site operation space.
本发明公开了一种桥面吊机的辅助挂索系统及其使用方法,在桥面吊机的后锚梁设置辅助挂索系统,包括连接座、主体桁架、顶部桁架,顶部桁架的外侧向下连接轨道梁,轨道梁上设置多套起升装置,通过设置可伸缩改变长度的立柱,可以灵活调整整个辅助挂索结构的适用高度,顺利避开桥面施工设备以及其他作业面,从而使得架梁作业和挂索施工互不干扰,通过设置控制系统,并分别与旋转电机、顶推油缸、起升装置连接,实现挂索过程的自动化、远程智能运行控制,不再主要依赖人为的经验判断,提高了对斜拉索移动的调控精度,同时有利于保证挂索施工的安全性和施工效率,无需在施工现场增加其他的施工机械,有效的节省了现场作业空间。
Auxiliary cable hanging system of deck crane and using method of auxiliary cable hanging system
The invention discloses an auxiliary cable hanging system of a bridge deck crane and a using method thereof.The auxiliary cable hanging system is arranged on a rear anchor beam of the bridge deck crane and comprises a connecting base, a main truss and a top truss, the outer side of the top truss is downwards connected with a track beam, a plurality of lifting devices are arranged on the track beam, and by arranging a telescopic stand column with the length changed, the main truss is connected with the main truss; the applicable height of the whole auxiliary cable hanging structure can be flexibly adjusted, bridge floor construction equipment and other working faces can be smoothly avoided, so that beam erecting operation and cable hanging construction do not interfere with each other, a control system is arranged and connected with a rotating motor, a pushing oil cylinder and a lifting device, automatic and remote intelligent operation control over the cable hanging process is achieved, and the construction efficiency is improved. The device is simple in structure and convenient to use, does not mainly depend on artificial experience judgment, improves regulation and control precision of movement of the stay cable, meanwhile, is beneficial for guaranteeing safety and construction efficiency of cable hanging construction, does not need to add other construction machines on a construction site, and effectively saves site operation space.
本发明公开了一种桥面吊机的辅助挂索系统及其使用方法,在桥面吊机的后锚梁设置辅助挂索系统,包括连接座、主体桁架、顶部桁架,顶部桁架的外侧向下连接轨道梁,轨道梁上设置多套起升装置,通过设置可伸缩改变长度的立柱,可以灵活调整整个辅助挂索结构的适用高度,顺利避开桥面施工设备以及其他作业面,从而使得架梁作业和挂索施工互不干扰,通过设置控制系统,并分别与旋转电机、顶推油缸、起升装置连接,实现挂索过程的自动化、远程智能运行控制,不再主要依赖人为的经验判断,提高了对斜拉索移动的调控精度,同时有利于保证挂索施工的安全性和施工效率,无需在施工现场增加其他的施工机械,有效的节省了现场作业空间。
Auxiliary cable hanging system of deck crane and using method of auxiliary cable hanging system
一种桥面吊机的辅助挂索系统及其使用方法
LI HAIFANG (author) / ZHANG CHAO (author) / TANG LIMING (author) / WANG HENGKE (author) / LI TIANCHENG (author) / WANG ZHEN (author)
2023-06-23
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|Hanging and buckling combined cable crane tower construction method
European Patent Office | 2024
|European Patent Office | 2022
|