A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of shear walls, and discloses an anti-cracking and anti-seepage assembled integral prefabricated shear wall which comprises a first wall body and second wall bodies, first grooves are formed in the four ends of the symmetrical side faces of the first wall body, and four second grooves are formed in the first wall body and communicate with the four first grooves correspondingly; a strip-shaped mounting block is vertically and fixedly mounted on one side of the first wall body, first openings are formed in the two ends of the side, away from the first wall body, of the strip-shaped mounting block correspondingly, second openings are formed in the two ends of the interior of the strip-shaped mounting block correspondingly, the two second openings communicate with the two first openings correspondingly, and the second wall body and the first wall body are arranged in parallel. And a fixing mechanism used for fixing the strip-shaped mounting block is arranged on the side, close to the first wall body, of the second wall body. Through the arrangement of the strip-shaped mounting blocks, the strip-shaped plates and the L-shaped clamping blocks, the first wall body and the second wall body can be rapidly and stably fixed, on-site pouring is not needed, and the cleanliness of a construction site is further improved.
本发明涉及剪力墙技术领域,公开了防裂防渗装配整体式预制剪力墙,包括第一墙体和第二墙体,所述第一墙体一对称侧面四端均开设有第一凹槽,且第一墙体内部开设有四个第二凹槽并分别和四个第一凹槽连通,所述第一墙体一侧竖直固定安装有条形安装块,且条形安装块远离第一墙体的一侧两端均开设有第一开口,且条形安装块内部两端均开设有第二开口,两个所述第二开口分别和两个第一开口连通,所述第二墙体和第一墙体平行设置,且第二墙体靠近第一墙体的一侧设有用于固定条形安装块的固定机构。本发明通过条形安装块、条形板和L型卡块的设置,可对第一墙体和第二墙体进行快速稳固的固定,无需现场浇注,进一步的提高了施工现场的整洁性。
The invention relates to the technical field of shear walls, and discloses an anti-cracking and anti-seepage assembled integral prefabricated shear wall which comprises a first wall body and second wall bodies, first grooves are formed in the four ends of the symmetrical side faces of the first wall body, and four second grooves are formed in the first wall body and communicate with the four first grooves correspondingly; a strip-shaped mounting block is vertically and fixedly mounted on one side of the first wall body, first openings are formed in the two ends of the side, away from the first wall body, of the strip-shaped mounting block correspondingly, second openings are formed in the two ends of the interior of the strip-shaped mounting block correspondingly, the two second openings communicate with the two first openings correspondingly, and the second wall body and the first wall body are arranged in parallel. And a fixing mechanism used for fixing the strip-shaped mounting block is arranged on the side, close to the first wall body, of the second wall body. Through the arrangement of the strip-shaped mounting blocks, the strip-shaped plates and the L-shaped clamping blocks, the first wall body and the second wall body can be rapidly and stably fixed, on-site pouring is not needed, and the cleanliness of a construction site is further improved.
本发明涉及剪力墙技术领域,公开了防裂防渗装配整体式预制剪力墙,包括第一墙体和第二墙体,所述第一墙体一对称侧面四端均开设有第一凹槽,且第一墙体内部开设有四个第二凹槽并分别和四个第一凹槽连通,所述第一墙体一侧竖直固定安装有条形安装块,且条形安装块远离第一墙体的一侧两端均开设有第一开口,且条形安装块内部两端均开设有第二开口,两个所述第二开口分别和两个第一开口连通,所述第二墙体和第一墙体平行设置,且第二墙体靠近第一墙体的一侧设有用于固定条形安装块的固定机构。本发明通过条形安装块、条形板和L型卡块的设置,可对第一墙体和第二墙体进行快速稳固的固定,无需现场浇注,进一步的提高了施工现场的整洁性。
Anti-cracking and anti-seepage assembled integral prefabricated shear wall
防裂防渗装配整体式预制剪力墙
SUN BING (author)
2023-06-23
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Prefabricated anti-water-seepage dismounting-free shear wall form board
European Patent Office | 2020
|Prefabricated part joint anti-seepage construction method and anti-seepage structure
European Patent Office | 2022
|