Modular construction method for vertical pipe of super high-rise pipe well
The invention discloses a modular construction method for a vertical pipe of a super high-rise pipe well, which comprises the following steps: according to a BIM (Building Information Modeling) deepening processing drawing and an assembly drawing, carrying out cutting, splicing and combined welding on a modular pipe group and a pipe frame, and carrying out combination, fixation and installation on a pipeline and the pipe frame to finish the prefabrication processing work of a modular vertical pipe group; through an efficient transportation mode of tower crane out-building hoisting transportation, platform truck floor transportation and travelling crane hoisting system in-tube-well vertical transportation, the modular riser group is transferred in place; by installing the movable support and adjusting and fixing the movable support, the installation and in-place work of the modular pipe set is completed. According to the method, deepening and prefabrication machining are combined, and the machining depth requirement of factory prefabrication is met; the method is deeply combined with the actual construction site, and meets the requirements of construction schemes such as site reservation, pre-burying and installation.
本发明公开了一种超高层管井立管模块化施工方法,包括:按照BIM深化加工图和装配图对模块化管组管架进行切割、拼装、组合焊接,管道与管架进行组合、固定、安装,完成模块化立管管组预制加工工作;通过塔吊楼外吊装运输,平台车楼层运输,行车吊运系统管井内垂直运输的高效运输方式,完成模块化立管管组的倒运就位工作;通过安装可动支架及对可动支架的调整固定,完成模块化管组的安装就位工作。本发明方法采用深化与预制加工结合,满足工厂预制的加工深度要求;深化与施工现场实际结合,适应现场预留、预埋及安装等施工方案的要求。
Modular construction method for vertical pipe of super high-rise pipe well
The invention discloses a modular construction method for a vertical pipe of a super high-rise pipe well, which comprises the following steps: according to a BIM (Building Information Modeling) deepening processing drawing and an assembly drawing, carrying out cutting, splicing and combined welding on a modular pipe group and a pipe frame, and carrying out combination, fixation and installation on a pipeline and the pipe frame to finish the prefabrication processing work of a modular vertical pipe group; through an efficient transportation mode of tower crane out-building hoisting transportation, platform truck floor transportation and travelling crane hoisting system in-tube-well vertical transportation, the modular riser group is transferred in place; by installing the movable support and adjusting and fixing the movable support, the installation and in-place work of the modular pipe set is completed. According to the method, deepening and prefabrication machining are combined, and the machining depth requirement of factory prefabrication is met; the method is deeply combined with the actual construction site, and meets the requirements of construction schemes such as site reservation, pre-burying and installation.
本发明公开了一种超高层管井立管模块化施工方法,包括:按照BIM深化加工图和装配图对模块化管组管架进行切割、拼装、组合焊接,管道与管架进行组合、固定、安装,完成模块化立管管组预制加工工作;通过塔吊楼外吊装运输,平台车楼层运输,行车吊运系统管井内垂直运输的高效运输方式,完成模块化立管管组的倒运就位工作;通过安装可动支架及对可动支架的调整固定,完成模块化管组的安装就位工作。本发明方法采用深化与预制加工结合,满足工厂预制的加工深度要求;深化与施工现场实际结合,适应现场预留、预埋及安装等施工方案的要求。
Modular construction method for vertical pipe of super high-rise pipe well
超高层管井立管模块化施工方法
WANG ZHENXING (author) / GAO HAN (author) / YU HAOQUAN (author) / GAO YAN (author) / ZHANG RUI (author)
2023-06-23
Patent
Electronic Resource
Chinese
Construction method for vertical pipe of super high-rise building engineering pipe well
European Patent Office | 2022
|Super high-rise common structure vertical shaft air pipe installation method
European Patent Office | 2023
|Concrete pump pipe fixing structure for super high-rise building construction
European Patent Office | 2022
|Concrete pump pipe fixing structure for super high-rise building construction
European Patent Office | 2020
|European Patent Office | 2023
|