A platform for research: civil engineering, architecture and urbanism
Tower crane attachment embedded part construction structure for concrete cylinder and construction method of tower crane attachment embedded part construction structure
The invention discloses a tower crane attachment embedded part construction structure for a concrete cylinder and a construction method thereof, and belongs to the technical field of tower crane construction, the tower crane attachment embedded part construction structure for the concrete cylinder comprises two structural columns and a tower crane attachment frame, and the two structural columns and the tower crane attachment frame are arranged in a triangular shape; connecting pieces are embedded in the structural columns, and the connecting pieces and the tower crane attachment frame are connected through tower crane attachment rods. The connecting piece comprises an arc-shaped steel plate, anchor bars arranged and welded to the concave face of the arc-shaped steel plate at intervals, a lug plate horizontally arranged and welded to the convex face of the arc-shaped steel plate and rib plates vertically welded to the upper surface and the lower surface of the lug plate at intervals, and a connecting hole is formed in the lug plate. The problems that when a floor column is a cylinder, a traditional embedded part is not matched with the cylinder and cannot be attached, the cylinder is damaged, and the structural quality is affected are solved.
用于混凝土圆柱的塔吊附着预埋件施工结构及其施工方法,属于塔吊施工技术领域,用于混凝土圆柱的塔吊附着预埋件施工结构包括两根结构柱和一个塔吊附着框,三者呈三角形布设;结构柱上预埋有连接件,连接件和塔吊附着框之间通过塔吊附着杆连接。连接件包括圆弧形钢板、间隔设置焊接在圆弧形钢板的凹面的锚筋、水平设置焊接在圆弧形钢板的凸面的耳板及竖直间隔焊接在耳板上、下表面的肋板,耳板上开有连接孔。本发明解决所在楼层柱为圆柱时传统的预埋件与圆柱不匹配,无法附着,对圆柱造成损害,影响结构质量的问题。
Tower crane attachment embedded part construction structure for concrete cylinder and construction method of tower crane attachment embedded part construction structure
The invention discloses a tower crane attachment embedded part construction structure for a concrete cylinder and a construction method thereof, and belongs to the technical field of tower crane construction, the tower crane attachment embedded part construction structure for the concrete cylinder comprises two structural columns and a tower crane attachment frame, and the two structural columns and the tower crane attachment frame are arranged in a triangular shape; connecting pieces are embedded in the structural columns, and the connecting pieces and the tower crane attachment frame are connected through tower crane attachment rods. The connecting piece comprises an arc-shaped steel plate, anchor bars arranged and welded to the concave face of the arc-shaped steel plate at intervals, a lug plate horizontally arranged and welded to the convex face of the arc-shaped steel plate and rib plates vertically welded to the upper surface and the lower surface of the lug plate at intervals, and a connecting hole is formed in the lug plate. The problems that when a floor column is a cylinder, a traditional embedded part is not matched with the cylinder and cannot be attached, the cylinder is damaged, and the structural quality is affected are solved.
用于混凝土圆柱的塔吊附着预埋件施工结构及其施工方法,属于塔吊施工技术领域,用于混凝土圆柱的塔吊附着预埋件施工结构包括两根结构柱和一个塔吊附着框,三者呈三角形布设;结构柱上预埋有连接件,连接件和塔吊附着框之间通过塔吊附着杆连接。连接件包括圆弧形钢板、间隔设置焊接在圆弧形钢板的凹面的锚筋、水平设置焊接在圆弧形钢板的凸面的耳板及竖直间隔焊接在耳板上、下表面的肋板,耳板上开有连接孔。本发明解决所在楼层柱为圆柱时传统的预埋件与圆柱不匹配,无法附着,对圆柱造成损害,影响结构质量的问题。
Tower crane attachment embedded part construction structure for concrete cylinder and construction method of tower crane attachment embedded part construction structure
用于混凝土圆柱的塔吊附着预埋件施工结构及其施工方法
TAO ZHENHUA (author) / DONG FANGQING (author) / GUO CHAO (author) / YANG LIANG (author) / PAN JIAZHAN (author) / DONG JIZHAO (author) / SHI WEIGUO (author) / DING NING (author) / PEI WENJUN (author) / ZHENG JIAWEI (author)
2023-06-27
Patent
Electronic Resource
Chinese
Flat arm tower crane attachment structure and construction method thereof
European Patent Office | 2022
|Tower crane attachment cross-layer reinforcing structure and construction method thereof
European Patent Office | 2024
|Tower crane foundation structure of construction-free tower crane pile
European Patent Office | 2024
|External tower crane alternate conversion attachment system and construction method
European Patent Office | 2021
|