A platform for research: civil engineering, architecture and urbanism
Tower crane foundation structure of construction-free tower crane pile
The invention mainly relates to the technical field of construction towers, in particular to a tower crane foundation structure of a construction-free tower crane pile, which comprises a construction tower body and a jet grouting drilling rig for construction, the bottom of the construction tower body is fixedly connected with a bearing seat, and the bottom of the bearing seat is fixedly connected with a tower base; the bottom of the tower base is fixedly connected with a mounting frame body, the bottom of the mounting frame body is fixedly provided with an adjusting structure, the bottom of the adjusting structure is connected with a wheel rail, the bottom of the wheel rail is connected with a transverse frame body, the bottom of the transverse frame body is fixedly connected with a cement mixing pile, and the cement mixing pile is arranged on a foundation. Vertical frame bodies are fixedly arranged at the tops of the left side and the right side of the transverse frame body; according to the method, an existing mode of installing the pile body through a hanging pile is changed into a mode of installing the pile body through the cement mixing pile, construction equipment is relatively simple, the construction efficiency is high, and reduction of the engineering cost is facilitated.
本发明主要涉及施工塔的技术领域,具体为一种免施工塔吊桩的塔吊基础结构,包括施工塔本体以及用于施工的旋喷钻机,所述施工塔本体的底部固定连接有承载座,所述承载座的底部固定连接有塔基座,所述塔基座的底部固定连接有安装架体,所述安装架体的底部固定设置有调节结构,所述调节结构的底部连接有轮轨,所述轮轨的底部连接有横向架体,所述横向架体的底部固定连接有水泥搅拌桩,所述水泥搅拌桩设置于地基上,所述横向架体的左右两侧顶部均固定设置有竖向架体;本发明通过将现有通过吊桩安装桩体的方式改为通过水泥搅拌桩的方式来进行安装,施工设备相对较为简单,施工效率高,有助于降低工程成本。
Tower crane foundation structure of construction-free tower crane pile
The invention mainly relates to the technical field of construction towers, in particular to a tower crane foundation structure of a construction-free tower crane pile, which comprises a construction tower body and a jet grouting drilling rig for construction, the bottom of the construction tower body is fixedly connected with a bearing seat, and the bottom of the bearing seat is fixedly connected with a tower base; the bottom of the tower base is fixedly connected with a mounting frame body, the bottom of the mounting frame body is fixedly provided with an adjusting structure, the bottom of the adjusting structure is connected with a wheel rail, the bottom of the wheel rail is connected with a transverse frame body, the bottom of the transverse frame body is fixedly connected with a cement mixing pile, and the cement mixing pile is arranged on a foundation. Vertical frame bodies are fixedly arranged at the tops of the left side and the right side of the transverse frame body; according to the method, an existing mode of installing the pile body through a hanging pile is changed into a mode of installing the pile body through the cement mixing pile, construction equipment is relatively simple, the construction efficiency is high, and reduction of the engineering cost is facilitated.
本发明主要涉及施工塔的技术领域,具体为一种免施工塔吊桩的塔吊基础结构,包括施工塔本体以及用于施工的旋喷钻机,所述施工塔本体的底部固定连接有承载座,所述承载座的底部固定连接有塔基座,所述塔基座的底部固定连接有安装架体,所述安装架体的底部固定设置有调节结构,所述调节结构的底部连接有轮轨,所述轮轨的底部连接有横向架体,所述横向架体的底部固定连接有水泥搅拌桩,所述水泥搅拌桩设置于地基上,所述横向架体的左右两侧顶部均固定设置有竖向架体;本发明通过将现有通过吊桩安装桩体的方式改为通过水泥搅拌桩的方式来进行安装,施工设备相对较为简单,施工效率高,有助于降低工程成本。
Tower crane foundation structure of construction-free tower crane pile
一种免施工塔吊桩的塔吊基础结构
JIANG KUO (author) / WANG MENG (author) / LIU SIQUAN (author) / RAN PENG (author) / WANG XINKE (author) / LI CHUNYANG (author)
2024-07-12
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|Tower crane foundation, tower crane and mounting method of tower crane
European Patent Office | 2024
|Tower crane foundation for foundation pit and construction method of tower crane foundation
European Patent Office | 2020
|Construction technology using single pile foundation as tower crane foundation
European Patent Office | 2023
|