A platform for research: civil engineering, architecture and urbanism
The embodiment of the invention provides assembly type prefabricated shear wall installation detection equipment and a construction method thereof. The assembly type prefabricated shear wall installation detection equipment comprises a base, a height adjusting device, an installation plate, a leveling device and a clamping device. The base is provided with a walking mechanism, the height adjusting device is arranged on the base, the mounting plate is connected to the height adjusting device, and the leveling device is movably arranged on the mounting plate and can do pitching motion around the mounting plate. The clamping device is arranged on the leveling device. According to the assembly type prefabricated shear wall installation detection equipment, the height of the prefabricated shear wall can be adjusted, the perpendicularity of the prefabricated shear wall can be adjusted according to construction parameters, the purpose of improving the construction quality is achieved, the prefabricated shear wall can be clamped and fixed, the situation that the prefabricated shear wall topples over is avoided, the purpose of improving the construction quality is achieved, and the construction efficiency is improved. And the construction efficiency is obviously improved.
本申请实施例提供一种装配式预制剪力墙安装检测设备及其施工方法,装配式预制剪力墙安装检测设备包括:底座、调高装置、安装板、调平装置和夹持装置。底座具有行走机构,调高装置设置于底座上,安装板连接于调高装置,调平装置可活动地设置于安装板,调平装置能绕安装板俯仰运动。夹持装置设置于调平装置。本申请的装配式预制剪力墙安装检测设备可以调节预制剪力墙的高度,可以根据施工参数调节预制剪力墙的垂直度,达到提升施工质量的目的,还可以对预制剪力墙夹持固定,避免预制剪力墙出现倾倒的情况,达到了提升施工质量的目的,显著的提高了施工效率。
The embodiment of the invention provides assembly type prefabricated shear wall installation detection equipment and a construction method thereof. The assembly type prefabricated shear wall installation detection equipment comprises a base, a height adjusting device, an installation plate, a leveling device and a clamping device. The base is provided with a walking mechanism, the height adjusting device is arranged on the base, the mounting plate is connected to the height adjusting device, and the leveling device is movably arranged on the mounting plate and can do pitching motion around the mounting plate. The clamping device is arranged on the leveling device. According to the assembly type prefabricated shear wall installation detection equipment, the height of the prefabricated shear wall can be adjusted, the perpendicularity of the prefabricated shear wall can be adjusted according to construction parameters, the purpose of improving the construction quality is achieved, the prefabricated shear wall can be clamped and fixed, the situation that the prefabricated shear wall topples over is avoided, the purpose of improving the construction quality is achieved, and the construction efficiency is improved. And the construction efficiency is obviously improved.
本申请实施例提供一种装配式预制剪力墙安装检测设备及其施工方法,装配式预制剪力墙安装检测设备包括:底座、调高装置、安装板、调平装置和夹持装置。底座具有行走机构,调高装置设置于底座上,安装板连接于调高装置,调平装置可活动地设置于安装板,调平装置能绕安装板俯仰运动。夹持装置设置于调平装置。本申请的装配式预制剪力墙安装检测设备可以调节预制剪力墙的高度,可以根据施工参数调节预制剪力墙的垂直度,达到提升施工质量的目的,还可以对预制剪力墙夹持固定,避免预制剪力墙出现倾倒的情况,达到了提升施工质量的目的,显著的提高了施工效率。
Assembly type prefabricated shear wall installation detection equipment and construction method thereof
一种装配式预制剪力墙安装检测设备及其施工方法
HE LEI (author)
2023-06-27
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Prefabricated assembly type shear wall and construction method thereof
European Patent Office | 2021
|European Patent Office | 2020
|Prefabricated assembly type shear wall plate vertical splicing joint and installation method thereof
European Patent Office | 2021
|Installation and construction method for prefabricated concrete assembly type wall
European Patent Office | 2020
|Prefabricated assembly type profile steel concrete shear wall and construction method thereof
European Patent Office | 2015
|