A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of pouring formworks, in particular to a formwork connecting device for pouring a pier. According to the formwork connecting device for pouring the bridge pier, the formwork is convenient to disassemble and assemble. A formwork connecting device for pier pouring comprises formworks, correction mechanisms and tightening mechanisms, the correction mechanisms used for assembling the four formworks are arranged on the outer sides of the formworks, and the tightening mechanisms used for reinforcing connection of the upper portions of the formworks are placed between the tops of the adjacent formworks. The four formworks are spliced together, a connecting frame is inserted into a clamping sleeve, a clamping rod is moved inwards to be clamped into the connecting frame, a mounting frame and the connecting frame are fixed together through the clamping rod, and connection of the four formworks is completed; the mounting frame and an extrusion block are placed at the top of the splicing position of the formworks; a first threaded rod is rotated and drives a first threaded sleeve to move upwards; and the first threaded sleeve drives the extrusion block and the mounting plate frame to move inwards through the first swing rod so as to reinforce the connection of the upper part of the template.
本发明涉及浇注模板技术领域,尤其涉及一种浇筑桥墩用模板连接装置。本发明提供一种模板拆装方便的浇筑桥墩用模板连接装置。一种浇筑桥墩用模板连接装置,包括有模板、校正机构和收紧机构,模板外侧均设有用于组装四块模板的校正机构,相邻的模板顶部之间均放置有用于对模板的上部连接进行加固的收紧机构。将四块模板拼接在一起,连接架插入卡套内,向内移动卡杆卡进连接架内,通过卡杆将安装架与连接架固定在一起,完成四块模板的连接,将安装板架与挤块放置在模板的拼接处顶部,转动第一螺纹杆,第一螺纹杆带动第一螺纹套向上移动,第一螺纹套通过第一摆杆带动挤块和安装板架向内移动对模板的上部连接进行加固。
The invention relates to the technical field of pouring formworks, in particular to a formwork connecting device for pouring a pier. According to the formwork connecting device for pouring the bridge pier, the formwork is convenient to disassemble and assemble. A formwork connecting device for pier pouring comprises formworks, correction mechanisms and tightening mechanisms, the correction mechanisms used for assembling the four formworks are arranged on the outer sides of the formworks, and the tightening mechanisms used for reinforcing connection of the upper portions of the formworks are placed between the tops of the adjacent formworks. The four formworks are spliced together, a connecting frame is inserted into a clamping sleeve, a clamping rod is moved inwards to be clamped into the connecting frame, a mounting frame and the connecting frame are fixed together through the clamping rod, and connection of the four formworks is completed; the mounting frame and an extrusion block are placed at the top of the splicing position of the formworks; a first threaded rod is rotated and drives a first threaded sleeve to move upwards; and the first threaded sleeve drives the extrusion block and the mounting plate frame to move inwards through the first swing rod so as to reinforce the connection of the upper part of the template.
本发明涉及浇注模板技术领域,尤其涉及一种浇筑桥墩用模板连接装置。本发明提供一种模板拆装方便的浇筑桥墩用模板连接装置。一种浇筑桥墩用模板连接装置,包括有模板、校正机构和收紧机构,模板外侧均设有用于组装四块模板的校正机构,相邻的模板顶部之间均放置有用于对模板的上部连接进行加固的收紧机构。将四块模板拼接在一起,连接架插入卡套内,向内移动卡杆卡进连接架内,通过卡杆将安装架与连接架固定在一起,完成四块模板的连接,将安装板架与挤块放置在模板的拼接处顶部,转动第一螺纹杆,第一螺纹杆带动第一螺纹套向上移动,第一螺纹套通过第一摆杆带动挤块和安装板架向内移动对模板的上部连接进行加固。
Bridge pier pouring steel formwork reinforcing device for bridge construction
European Patent Office | 2024
|Fastening connecting device for building pouring formwork
European Patent Office | 2021
|