Wall decoration reverse operation construction method
A wall decoration reverse operation construction method comprises the following steps that S1, wall design parameters are determined, and a wall installation control line is popped on the ground; s2, according to the building design requirement, a decoration panel is manufactured; s3, a decoration panel is placed at the position of a wall face installation control line and vertically fixed to a structural beam plate, and the decoration face faces the inner side of a hoistway; s4, wall building blocks are built on the outer side of the decoration panel; the wall decoration reverse operation construction method has the beneficial effects that the decoration panel is manufactured in a component factory or an open site, and construction is convenient; the switch box and the wire tube are installed on the base plate, secondary grooving of the wall is avoided, wall cracking is effectively prevented, the construction quality is easy to control, and the wall decoration finished product quality is high; modularized manufacturing is adopted, and the construction efficiency is greatly improved.
一种墙体装修逆作业施工方法,包括以下步骤:步骤S1:确定墙面设计参数,在地面处弹放墙面安装控制线;步骤S2:按建筑设计要求,制作装饰面板;步骤S3:将装饰面板放置在墙面安装控制线处并竖直固定在结构梁板上,装饰面朝向在井道内侧;步骤S4:在装饰面板外侧进行墙体砌块砌筑;本发明的有益效果是:本发明一种墙体装修逆作业施工方法,装饰面板的制作选在构件厂或开阔场地施工方便;开关盒以及电线管安装在基板上,避免墙体二次开槽,有效防止墙体开裂,施工质量容易控制,墙面装饰成品质量高;采用模块化制作,施工效率大大提升。
Wall decoration reverse operation construction method
A wall decoration reverse operation construction method comprises the following steps that S1, wall design parameters are determined, and a wall installation control line is popped on the ground; s2, according to the building design requirement, a decoration panel is manufactured; s3, a decoration panel is placed at the position of a wall face installation control line and vertically fixed to a structural beam plate, and the decoration face faces the inner side of a hoistway; s4, wall building blocks are built on the outer side of the decoration panel; the wall decoration reverse operation construction method has the beneficial effects that the decoration panel is manufactured in a component factory or an open site, and construction is convenient; the switch box and the wire tube are installed on the base plate, secondary grooving of the wall is avoided, wall cracking is effectively prevented, the construction quality is easy to control, and the wall decoration finished product quality is high; modularized manufacturing is adopted, and the construction efficiency is greatly improved.
一种墙体装修逆作业施工方法,包括以下步骤:步骤S1:确定墙面设计参数,在地面处弹放墙面安装控制线;步骤S2:按建筑设计要求,制作装饰面板;步骤S3:将装饰面板放置在墙面安装控制线处并竖直固定在结构梁板上,装饰面朝向在井道内侧;步骤S4:在装饰面板外侧进行墙体砌块砌筑;本发明的有益效果是:本发明一种墙体装修逆作业施工方法,装饰面板的制作选在构件厂或开阔场地施工方便;开关盒以及电线管安装在基板上,避免墙体二次开槽,有效防止墙体开裂,施工质量容易控制,墙面装饰成品质量高;采用模块化制作,施工效率大大提升。
Wall decoration reverse operation construction method
一种墙体装修逆作业施工方法
LONG QISHENG (author) / ZHANG CHUNYU (author) / CHEN ZHONGQUAN (author) / ZHANG YAQIANG (author) / LIN MEISHEN (author) / MAI SHIYUN (author)
2023-06-30
Patent
Electronic Resource
Chinese
Building curtain wall outer wall decoration operation construction equipment
European Patent Office | 2022
|WALL DECORATION MATERIAL AND WALL DECORATION MATERIAL CONSTRUCTION METHOD
European Patent Office | 2020
|Building wall decoration robot and building wall decoration construction method
European Patent Office | 2024
|Building curtain wall decoration automation operation construction device
European Patent Office | 2020
|