Wetland trestle construction method
The invention discloses a wetland plank road construction method which comprises the following steps: measuring a wetland construction site by adopting RTK (Real Time Kinematic) or a total station, providing engineering parameters of line trend, gradient and road width, measuring a setting-out position by utilizing a GPS (Global Positioning System) according to a setting-out plane positioning map, and driving a timber pile as a mark; building and constructing a rubble construction road; construction of the non-overhead plank road: tamping silt earthwork, and fastening a plurality of cushion layers to form the non-overhead plank road with a symmetrical structure from bottom to top; construction of the overhead plank road: building a double-Y-shaped overhead plank road bearing platform, and forming the overhead plank road with a multi-layer structure on the bearing platform from bottom to top. According to the construction method, the plank roads of different structures are built according to different depths of sludge in the wetland, the environment of the wetland is protected by building the rubble construction shortcuts, time and labor are saved during construction of the plank roads, and the engineering quality is improved.
本发明公开了一种湿地栈道施工方法,包括采用RTK或全站仪对湿地施工场地进行测量、提供线路走向、坡度以及道路宽度工程参数,根据放线平面定位图,利用GPS测出放样位置,打入木桩作为标记;毛石施工便道修筑施工;非架空栈道施工:淤泥土方夯实,多层垫层紧固形成自下而上对称结构的非架空栈道;架空栈道施工:修筑双Y型架空栈道承台、在承台上自下而上形成多层结构的架空栈道。本发明的施工方法根据湿地中淤泥深度的不同建筑不同结构的栈道,通过修筑毛石施工便道,保护了湿地的环境,栈道施工省时省力、提升了工程质量。
Wetland trestle construction method
The invention discloses a wetland plank road construction method which comprises the following steps: measuring a wetland construction site by adopting RTK (Real Time Kinematic) or a total station, providing engineering parameters of line trend, gradient and road width, measuring a setting-out position by utilizing a GPS (Global Positioning System) according to a setting-out plane positioning map, and driving a timber pile as a mark; building and constructing a rubble construction road; construction of the non-overhead plank road: tamping silt earthwork, and fastening a plurality of cushion layers to form the non-overhead plank road with a symmetrical structure from bottom to top; construction of the overhead plank road: building a double-Y-shaped overhead plank road bearing platform, and forming the overhead plank road with a multi-layer structure on the bearing platform from bottom to top. According to the construction method, the plank roads of different structures are built according to different depths of sludge in the wetland, the environment of the wetland is protected by building the rubble construction shortcuts, time and labor are saved during construction of the plank roads, and the engineering quality is improved.
本发明公开了一种湿地栈道施工方法,包括采用RTK或全站仪对湿地施工场地进行测量、提供线路走向、坡度以及道路宽度工程参数,根据放线平面定位图,利用GPS测出放样位置,打入木桩作为标记;毛石施工便道修筑施工;非架空栈道施工:淤泥土方夯实,多层垫层紧固形成自下而上对称结构的非架空栈道;架空栈道施工:修筑双Y型架空栈道承台、在承台上自下而上形成多层结构的架空栈道。本发明的施工方法根据湿地中淤泥深度的不同建筑不同结构的栈道,通过修筑毛石施工便道,保护了湿地的环境,栈道施工省时省力、提升了工程质量。
Wetland trestle construction method
湿地栈道施工方法
REN CHANGCHUN (author) / XIANG HANYU (author) / SUN PENGBIAO (author) / YU HUAN (author) / SUN YANG (author) / LIU YUEGUANG (author)
2023-07-07
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction method of trestle supporting structure, trestle supporting structure and trestle
European Patent Office | 2023
|Fabricated steel trestle structure and steel trestle construction method
European Patent Office | 2023
|