A platform for research: civil engineering, architecture and urbanism
Foundation pit construction moisture-proof facility and operation method thereof
The invention discloses a foundation pit construction damp-proof facility and an operation method thereof, and relates to the technical field of foundation pit damp-proof. A bottom plate is arranged, a through hole groove is formed in the left side of the bottom plate, a pressing roller is rotationally connected to the right side of the through hole groove, the outer surface of a supporting frame is sleeved with a movable block, and the top end of the movable block is fixedly connected with a first fixing block; a first fixing block is fixedly connected to the top end of the supporting rod, a second fire-jet head is arranged in the middle of the first fixing block, a second fixing block is fixedly connected to the top end of the supporting rod, and a third fire-jet head is arranged in the second fixing block. The second fire-jet head and the third fire-jet head move back and forth to heat the asphalt coiled material, the third fire-jet head preheats firstly, the second fire-jet head melts asphalt on the asphalt coiled material, the melted asphalt on the asphalt coiled material adheres to the ground, the pressing roller compacts the asphalt coiled material attached to the ground, the asphalt coiled material is laid conveniently, and the working efficiency is high.
本发明公开了基坑施工防潮设施及其操作方法,涉及基坑防潮技术领域,底板,底板的左侧开设有通孔槽,通孔槽的右侧转动连接有压辊,支撑架的外表面套设有活动块,活动块的顶端固定连接有第一固定块,第一固定块的中部设置有第二喷火头,支撑杆的顶端固定连接有第二固定块,第二固定块的内部设置有第三喷火头,本发明驱动组件工作,在连接软管的作用下使活动块沿支撑架做前后方向的往复运动,进而使第二喷火头和第三喷火头前后运动,对沥青卷材进行加热,第三喷火头先进行预热,第二喷火头将沥青卷材上的沥青熔化,沥青卷材上熔化的沥青黏附在地面,压辊对贴附在地面上的沥青卷材进行压实,铺设沥青卷材方便,工作效率高。
Foundation pit construction moisture-proof facility and operation method thereof
The invention discloses a foundation pit construction damp-proof facility and an operation method thereof, and relates to the technical field of foundation pit damp-proof. A bottom plate is arranged, a through hole groove is formed in the left side of the bottom plate, a pressing roller is rotationally connected to the right side of the through hole groove, the outer surface of a supporting frame is sleeved with a movable block, and the top end of the movable block is fixedly connected with a first fixing block; a first fixing block is fixedly connected to the top end of the supporting rod, a second fire-jet head is arranged in the middle of the first fixing block, a second fixing block is fixedly connected to the top end of the supporting rod, and a third fire-jet head is arranged in the second fixing block. The second fire-jet head and the third fire-jet head move back and forth to heat the asphalt coiled material, the third fire-jet head preheats firstly, the second fire-jet head melts asphalt on the asphalt coiled material, the melted asphalt on the asphalt coiled material adheres to the ground, the pressing roller compacts the asphalt coiled material attached to the ground, the asphalt coiled material is laid conveniently, and the working efficiency is high.
本发明公开了基坑施工防潮设施及其操作方法,涉及基坑防潮技术领域,底板,底板的左侧开设有通孔槽,通孔槽的右侧转动连接有压辊,支撑架的外表面套设有活动块,活动块的顶端固定连接有第一固定块,第一固定块的中部设置有第二喷火头,支撑杆的顶端固定连接有第二固定块,第二固定块的内部设置有第三喷火头,本发明驱动组件工作,在连接软管的作用下使活动块沿支撑架做前后方向的往复运动,进而使第二喷火头和第三喷火头前后运动,对沥青卷材进行加热,第三喷火头先进行预热,第二喷火头将沥青卷材上的沥青熔化,沥青卷材上熔化的沥青黏附在地面,压辊对贴附在地面上的沥青卷材进行压实,铺设沥青卷材方便,工作效率高。
Foundation pit construction moisture-proof facility and operation method thereof
基坑施工防潮设施及其操作方法
WEI ZHI (author) / ZHAO YUBIN (author) / ZHU JUNWEI (author) / YANG SUYAN (author) / HOU LIQIN (author) / YAN GUOXIA (author)
2023-07-07
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|Frost-Proof and Moisture-Proof Building Foundation
NTIS | 1978
|Moisture-proof and water-proof supporting device for civil construction of foundation pit
European Patent Office | 2024
|ROOFTOP FACILITY FOUNDATION STRUCTURE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2021
|