A platform for research: civil engineering, architecture and urbanism
Construction method of super high-rise creeping formwork and aluminum formwork combined formwork
The invention is suitable for the technical field of buildings, and provides a construction method of a super high-rise creeping formwork and aluminum formwork combined formwork. The construction method comprises the following steps of shear wall steel bar binding, outer frame coupling beam steel bar binding, hydraulic climbing formwork climbing, opposite-pull screw rod arranging, vertical aluminum formwork splicing and full framing erecting, horizontal aluminum formwork splicing, formwork perpendicularity and levelness adjusting, climbing formwork and aluminum formwork joint reinforcing and formwork acceptance checking. The construction method provided by the invention has the advantages that the construction efficiency is high, the safe and civilized construction degree is high, a template system formed by construction is high in strength and high in bearing capacity, a small amount of on-site building waste is generated, construction management is convenient, the integrity of the template system is good, a concrete member is flat and smooth, and the forming effect is good.
本发明适用于建筑技术领域,提供了超高层爬模与铝模组合模板的施工工法,该工法包括下列流程:剪力墙钢筋绑扎、外框连梁钢筋绑扎、液压爬升模板爬升、设置对拉螺杆、竖向铝模板拼装及搭设满堂架、水平铝模板拼装、模板垂直度与水平度调整、爬模与铝模交接处加固以及模板验收。本发明提供的施工工法具有施工效率高,安全文明施工程度高,施工所构成的模板体系强度高、承载能力强、现场建筑废料少,方便施工管理,模板体系整体性好,混凝土构件平整光洁,成型效果好。
Construction method of super high-rise creeping formwork and aluminum formwork combined formwork
The invention is suitable for the technical field of buildings, and provides a construction method of a super high-rise creeping formwork and aluminum formwork combined formwork. The construction method comprises the following steps of shear wall steel bar binding, outer frame coupling beam steel bar binding, hydraulic climbing formwork climbing, opposite-pull screw rod arranging, vertical aluminum formwork splicing and full framing erecting, horizontal aluminum formwork splicing, formwork perpendicularity and levelness adjusting, climbing formwork and aluminum formwork joint reinforcing and formwork acceptance checking. The construction method provided by the invention has the advantages that the construction efficiency is high, the safe and civilized construction degree is high, a template system formed by construction is high in strength and high in bearing capacity, a small amount of on-site building waste is generated, construction management is convenient, the integrity of the template system is good, a concrete member is flat and smooth, and the forming effect is good.
本发明适用于建筑技术领域,提供了超高层爬模与铝模组合模板的施工工法,该工法包括下列流程:剪力墙钢筋绑扎、外框连梁钢筋绑扎、液压爬升模板爬升、设置对拉螺杆、竖向铝模板拼装及搭设满堂架、水平铝模板拼装、模板垂直度与水平度调整、爬模与铝模交接处加固以及模板验收。本发明提供的施工工法具有施工效率高,安全文明施工程度高,施工所构成的模板体系强度高、承载能力强、现场建筑废料少,方便施工管理,模板体系整体性好,混凝土构件平整光洁,成型效果好。
Construction method of super high-rise creeping formwork and aluminum formwork combined formwork
超高层爬模与铝模组合模板的施工工法
HUANG SHAONAN (author) / XIA TAO (author) / XIAO SHIKAI (author) / GUAN ZHENGYONG (author) / YIN YUNLOU (author) / WU RENJIAN (author) / LI ZHICHENG (author)
2023-07-07
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Solar cell creeping formwork guardrail and creeping formwork
European Patent Office | 2023
|European Patent Office | 2021
|European Patent Office | 2023
|Multifunctional connecting device for creeping formwork and creeping formwork platform
European Patent Office | 2023
|