Method for dismantling old bridge and building new bridge
The invention relates to the technical field of bridge engineering, and provides an old bridge dismantling and new bridge building method which comprises the steps that 1, auxiliary support construction is conducted on one side of an old bridge; 2, guide columns are constructed on the two sides of a navigation hole channel of the old bridge; a guide plate and an elastic reset piece used for controlling the guide plate to rotate and reset are rotationally arranged on the guide column, the guide plate can be attached to the outer side of a hull of the ship and can rotate relative to the horizontal plane, and the guide plate faces the navigation hole channel; and 3, a supporting foundation and a gantry crane are constructed and installed, the gantry crane stretches across the width direction of the old bridge and slides in the length direction of the old bridge, the supporting foundation comprises a plurality of first steel pipe piles fixed to the riverbed, and the first steel pipe piles are arranged in the length side direction of the old bridge at intervals, avoid the navigation hole channel and are located between the guide columns and the old bridge. On the basis, the effects that the influence of a ship on the bridge dismantling support can be reduced conveniently, and meanwhile abrasion to the ship is reduced can be achieved.
本申请涉及桥梁工程技术领域,提供了一种旧桥拆除和新桥搭建的方法,包括:步骤1:在旧桥的一侧进行辅支架施工;步骤2:在旧桥的通航孔航道两侧进行引导柱的施工;引导柱上转动设置有导向板和用于控制导向板转动复位的弹性复位件,导向板能够与船只的船壳外侧保持贴合、且能够相对在水平面发生转动,导向板朝向通航孔航道;步骤3:支撑基础和龙门吊的施工和安装,支龙门吊横跨旧桥的宽度方向并沿着旧桥的长度方向滑移,支撑基础包括多根固定于河床的第一钢管桩,各第一钢管桩沿着旧桥的长度侧方向间隔设置且避开通航孔航道,并位于引导柱与旧桥之间。基于此,可实现便于减小船只对拆桥支架的影响,同时减小船只受到的磨损的效果。
Method for dismantling old bridge and building new bridge
The invention relates to the technical field of bridge engineering, and provides an old bridge dismantling and new bridge building method which comprises the steps that 1, auxiliary support construction is conducted on one side of an old bridge; 2, guide columns are constructed on the two sides of a navigation hole channel of the old bridge; a guide plate and an elastic reset piece used for controlling the guide plate to rotate and reset are rotationally arranged on the guide column, the guide plate can be attached to the outer side of a hull of the ship and can rotate relative to the horizontal plane, and the guide plate faces the navigation hole channel; and 3, a supporting foundation and a gantry crane are constructed and installed, the gantry crane stretches across the width direction of the old bridge and slides in the length direction of the old bridge, the supporting foundation comprises a plurality of first steel pipe piles fixed to the riverbed, and the first steel pipe piles are arranged in the length side direction of the old bridge at intervals, avoid the navigation hole channel and are located between the guide columns and the old bridge. On the basis, the effects that the influence of a ship on the bridge dismantling support can be reduced conveniently, and meanwhile abrasion to the ship is reduced can be achieved.
本申请涉及桥梁工程技术领域,提供了一种旧桥拆除和新桥搭建的方法,包括:步骤1:在旧桥的一侧进行辅支架施工;步骤2:在旧桥的通航孔航道两侧进行引导柱的施工;引导柱上转动设置有导向板和用于控制导向板转动复位的弹性复位件,导向板能够与船只的船壳外侧保持贴合、且能够相对在水平面发生转动,导向板朝向通航孔航道;步骤3:支撑基础和龙门吊的施工和安装,支龙门吊横跨旧桥的宽度方向并沿着旧桥的长度方向滑移,支撑基础包括多根固定于河床的第一钢管桩,各第一钢管桩沿着旧桥的长度侧方向间隔设置且避开通航孔航道,并位于引导柱与旧桥之间。基于此,可实现便于减小船只对拆桥支架的影响,同时减小船只受到的磨损的效果。
Method for dismantling old bridge and building new bridge
一种旧桥拆除和新桥搭建的方法
DENG CHAOYOU (author) / LIU SIDE (author) / GAO YONG (author) / ZHANG YONG (author) / WANG HONG (author) / WAN CHENGFU (author) / XIE GUOQUAN (author) / ZHANG PANHUA (author) / LI HONGYU (author) / WEN QIFU (author)
2023-07-14
Patent
Electronic Resource
Chinese
Integrated prefabricated bridge dismantling machine and prefabricated bridge dismantling method
European Patent Office | 2021
|Cofferdam-based tied-arch bridge dismantling structure and bridge dismantling method
European Patent Office | 2021
|