A platform for research: civil engineering, architecture and urbanism
Diversion trench straight wall construction method based on threaded sleeve type refractory concrete prefabricated part
The invention discloses a diversion trench straight wall construction method based on a threaded sleeve type refractory concrete prefabricated part, and belongs to the technical field of civil engineering construction. The construction method is realized based on a threaded sleeve type refractory concrete prefabricated part, a traditional construction process of a diversion trench straight wall part is reversed, namely, a refractory concrete protective layer is constructed firstly, then straight wall structure concrete is poured, and the threaded sleeve type refractory concrete prefabricated part is used as a template for pouring the straight wall structure concrete. According to the construction method, the construction process of the refractory concrete protection layer and the construction process of the structural concrete are effectively fused, the number of times of formwork erecting is reduced, and the overall construction efficiency is improved.
本发明公开了一种基于螺纹套筒式耐火混凝土预制件的导流槽直墙施工方法,属于土木工程施工技术领域。该施工方法基于螺纹套筒式耐火混凝土预制件实现,将导流槽直墙部位的传统施工工序进行颠倒,即先施作耐火混凝土防护层,随即再浇筑直墙结构混凝土,利用螺纹套筒式耐火混凝土预制件作为直墙结构混凝土浇筑时的模板,耐火混凝土预制件吊运拼装与直墙竖筋、直墙水平筋的布设绑扎穿插进行,本发明的施工方法将耐火混凝土防护层和结构混凝土施工过程进行有效融合,减少支模次数,提高整体施工效率。
Diversion trench straight wall construction method based on threaded sleeve type refractory concrete prefabricated part
The invention discloses a diversion trench straight wall construction method based on a threaded sleeve type refractory concrete prefabricated part, and belongs to the technical field of civil engineering construction. The construction method is realized based on a threaded sleeve type refractory concrete prefabricated part, a traditional construction process of a diversion trench straight wall part is reversed, namely, a refractory concrete protective layer is constructed firstly, then straight wall structure concrete is poured, and the threaded sleeve type refractory concrete prefabricated part is used as a template for pouring the straight wall structure concrete. According to the construction method, the construction process of the refractory concrete protection layer and the construction process of the structural concrete are effectively fused, the number of times of formwork erecting is reduced, and the overall construction efficiency is improved.
本发明公开了一种基于螺纹套筒式耐火混凝土预制件的导流槽直墙施工方法,属于土木工程施工技术领域。该施工方法基于螺纹套筒式耐火混凝土预制件实现,将导流槽直墙部位的传统施工工序进行颠倒,即先施作耐火混凝土防护层,随即再浇筑直墙结构混凝土,利用螺纹套筒式耐火混凝土预制件作为直墙结构混凝土浇筑时的模板,耐火混凝土预制件吊运拼装与直墙竖筋、直墙水平筋的布设绑扎穿插进行,本发明的施工方法将耐火混凝土防护层和结构混凝土施工过程进行有效融合,减少支模次数,提高整体施工效率。
Diversion trench straight wall construction method based on threaded sleeve type refractory concrete prefabricated part
基于螺纹套筒式耐火混凝土预制件的导流槽直墙施工方法
LI WENLEI (author) / DENG ZHIPING (author) / LIU XIAOSHAN (author) / YIN XUFENG (author) / HE HUCHENG (author) / ZHOU JINGKAI (author) / CHEN LU (author) / LI ZHIQIANG (author)
2023-07-14
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|European Patent Office | 2024
|Construction method of diversion trench refractory concrete junction surface
European Patent Office | 2022
|Use method of prefabricated shear wall steel threaded sleeve
European Patent Office | 2020
|Diversion trench and diversion trench construction method
European Patent Office | 2016
|