A platform for research: civil engineering, architecture and urbanism
High-rise intelligent lifting platform construction equipment and method
The invention relates to the technical field of high-rise building equipment, in particular to high-rise intelligent lifting platform construction equipment and method.The high-rise intelligent lifting platform construction equipment comprises a movable base, a lifting assembly, a working platform and a dust removal assembly, and the dust removal assembly comprises a first movable frame, a second movable frame, a first elastic connecting piece and a water storage box; the first movable frames are arranged at the four corners of the working platform in a sliding mode, the second movable frames are arranged between the first movable frames and the working platform in a sliding mode, nozzles are fixedly arranged on the second movable frames, the first elastic connecting pieces are fixedly arranged between the second movable frames, and the water storage box is fixedly arranged at the bottom of the working platform. Water flow on the working platform can flow into the water storage box. The situation that a large amount of dust generated during work falls onto the working platform, and consequently the surface of the working platform and workers are polluted is avoided, the working environment of the workers is effectively improved, and meanwhile cleaning work of the whole equipment is convenient to conduct after use.
本发明涉及高层建筑设备技术领域,具体是涉及一种高层智能提升平台施工设备及方法,包括有移动底座、升降组件、工作平台和除尘组件,除尘组件包括有第一活动框、第二活动框、第一弹性连接件和储水盒,第一活动框能够滑动的设置在工作平台的四个角落,第二活动框能够滑动的设置在第一活动框和工作平台之间,第二活动框上固定设置有喷头,第一弹性连接件固定设置在第二活动框之间,储水盒固定设置在工作平台的底部,工作平台上的水流能够流入至储水盒的内部。本发明避免因工作产生的灰尘会大量落入至工作平台上从而对工作平台表面和工作人员进行污染,有效改善了工作人员的工作环境,同时也使得使用完后整体设备的清洁工作方便进行。
High-rise intelligent lifting platform construction equipment and method
The invention relates to the technical field of high-rise building equipment, in particular to high-rise intelligent lifting platform construction equipment and method.The high-rise intelligent lifting platform construction equipment comprises a movable base, a lifting assembly, a working platform and a dust removal assembly, and the dust removal assembly comprises a first movable frame, a second movable frame, a first elastic connecting piece and a water storage box; the first movable frames are arranged at the four corners of the working platform in a sliding mode, the second movable frames are arranged between the first movable frames and the working platform in a sliding mode, nozzles are fixedly arranged on the second movable frames, the first elastic connecting pieces are fixedly arranged between the second movable frames, and the water storage box is fixedly arranged at the bottom of the working platform. Water flow on the working platform can flow into the water storage box. The situation that a large amount of dust generated during work falls onto the working platform, and consequently the surface of the working platform and workers are polluted is avoided, the working environment of the workers is effectively improved, and meanwhile cleaning work of the whole equipment is convenient to conduct after use.
本发明涉及高层建筑设备技术领域,具体是涉及一种高层智能提升平台施工设备及方法,包括有移动底座、升降组件、工作平台和除尘组件,除尘组件包括有第一活动框、第二活动框、第一弹性连接件和储水盒,第一活动框能够滑动的设置在工作平台的四个角落,第二活动框能够滑动的设置在第一活动框和工作平台之间,第二活动框上固定设置有喷头,第一弹性连接件固定设置在第二活动框之间,储水盒固定设置在工作平台的底部,工作平台上的水流能够流入至储水盒的内部。本发明避免因工作产生的灰尘会大量落入至工作平台上从而对工作平台表面和工作人员进行污染,有效改善了工作人员的工作环境,同时也使得使用完后整体设备的清洁工作方便进行。
High-rise intelligent lifting platform construction equipment and method
一种高层智能提升平台施工设备及方法
WANG GUOQIANG (author) / LU TIANJIN (author) / YANG XIANGDONG (author) / LI XIAOSHENG (author) / ZHONG PENG (author) / LI JINTIAN (author)
2023-07-14
Patent
Electronic Resource
Chinese
Intelligent lifting construction method for high-rise building
European Patent Office | 2020
|Intelligent building material lifting equipment and method for high-rise building construction
European Patent Office | 2021
|Electric lifting discharging platform for high-rise building structure construction
European Patent Office | 2021
|