Installation and construction method for shock insulation support
The invention relates to the technical field of shock insulation support installation, in particular to a shock insulation support installation construction method which comprises the following construction steps that S1, a sprue gate is formed in the center of a positioning steel plate, and manufacturing of four sets of embedded assemblies is completed; s2, positioning and paying off; s3, mounting a positioning steel plate and a pre-embedded assembly; s4, binding foundation beam bars and lower buttress steel bars; (S5) primary pouring is conducted, specifically, supporting of the enclosure formwork is completed, then concrete is poured into a forming space defined by the enclosure formwork through a pouring opening, the concrete is poured to the top of the foundation beam, and vibration treatment is conducted on the concrete in the pouring process; s6, secondary pouring is conducted, specifically, after the primarily-poured concrete is finally set, the positioning steel plate is dismantled, then lower buttress concrete pouring is conducted, and the concrete is vibrated in the pouring process; s7, mounting the shock insulation support: connecting and fixing the shock insulation support and the pre-embedded sleeve through a nut; the method has the effects that the forming quality of the lower buttress is improved, and then the mounting quality of the shock insulation support is improved.
本申请涉及隔震支座安装技术领域,尤其涉及一种隔震支座安装施工方法,包括以下施工步骤:S1:在定位钢板中心开设浇注口,并完成四组预埋组件的制作;S2:定位放线;S3:定位钢板、预埋组件安装;S4:基础梁筋、下支墩钢筋绑扎;S5:初次浇注:完成围护模板支设,再由浇注口向围护模板围成的成型空间内浇筑混凝土,混凝土浇注至基础梁的顶部,浇注过程中对混凝土振捣处理;S6:二次浇筑:初次浇注的混凝土终凝后,拆除定位钢板,再进行下支墩混凝土浇注,浇注过程中对混凝土振捣处理;S7:隔震支座安装:通过螺母将隔震支座和预埋套筒连接固定;本申请具有改善下支墩的成型质量,进而提高隔震支座的安装质量的效果。
Installation and construction method for shock insulation support
The invention relates to the technical field of shock insulation support installation, in particular to a shock insulation support installation construction method which comprises the following construction steps that S1, a sprue gate is formed in the center of a positioning steel plate, and manufacturing of four sets of embedded assemblies is completed; s2, positioning and paying off; s3, mounting a positioning steel plate and a pre-embedded assembly; s4, binding foundation beam bars and lower buttress steel bars; (S5) primary pouring is conducted, specifically, supporting of the enclosure formwork is completed, then concrete is poured into a forming space defined by the enclosure formwork through a pouring opening, the concrete is poured to the top of the foundation beam, and vibration treatment is conducted on the concrete in the pouring process; s6, secondary pouring is conducted, specifically, after the primarily-poured concrete is finally set, the positioning steel plate is dismantled, then lower buttress concrete pouring is conducted, and the concrete is vibrated in the pouring process; s7, mounting the shock insulation support: connecting and fixing the shock insulation support and the pre-embedded sleeve through a nut; the method has the effects that the forming quality of the lower buttress is improved, and then the mounting quality of the shock insulation support is improved.
本申请涉及隔震支座安装技术领域,尤其涉及一种隔震支座安装施工方法,包括以下施工步骤:S1:在定位钢板中心开设浇注口,并完成四组预埋组件的制作;S2:定位放线;S3:定位钢板、预埋组件安装;S4:基础梁筋、下支墩钢筋绑扎;S5:初次浇注:完成围护模板支设,再由浇注口向围护模板围成的成型空间内浇筑混凝土,混凝土浇注至基础梁的顶部,浇注过程中对混凝土振捣处理;S6:二次浇筑:初次浇注的混凝土终凝后,拆除定位钢板,再进行下支墩混凝土浇注,浇注过程中对混凝土振捣处理;S7:隔震支座安装:通过螺母将隔震支座和预埋套筒连接固定;本申请具有改善下支墩的成型质量,进而提高隔震支座的安装质量的效果。
Installation and construction method for shock insulation support
一种隔震支座安装施工方法
WU YANCHAO (author) / TANG XINHU (author) / WEN HUI (author) / WANG WEIDONG (author) / MA DI (author) / LI YONGHUI (author) / WANG YAODONG (author) / WANG DANGYIN (author)
2023-07-14
Patent
Electronic Resource
Chinese
Shock insulation support and installation and construction method thereof
European Patent Office | 2024
|Shock insulation support embedded steel plate installation structure and construction method
European Patent Office | 2024
|Shock insulation support seat and installation method thereof
European Patent Office | 2015
|Installation construction technology of low-temperature storage tank rubber shock insulation support
European Patent Office | 2021
|