Construction method for lifting beam on gantry crane beam
The invention relates to a construction method for lifting a beam on a gantry crane beam, which comprises the following steps of: arranging a beam lifting station in an area suitable for vehicles to pass under a bridge, and transporting a precast beam from a beam field to the lower part of the bridge by using a beam transporting vehicle; two-span continuous bridge piers are selected in a girder lifting station area, erection of two-span precast girders is completed through a truck crane, and two-span bridge floors serve as girder lifting platforms of the bridge girder erection machine; gantry crane rail foundations are poured on the two bridges, gantry cranes are installed, and the precast beams under the bridges are lifted to the bridges from the gap between the two bridges through the gantry cranes so that the bridge erecting machine can lift the beams and install the beams. The problem that the bridge head cannot transport the beam can be solved, the gantry crane is arranged on the bridge and is not limited by the pier height, and the construction safety of the gantry crane can be guaranteed.
本发明涉及一种龙门吊梁上提梁施工方法,在桥下适宜车辆通行区域设置提梁站,用运梁车将预制梁从梁场运至桥下;在提梁站区域选择两跨连续桥墩,用汽车吊完成两跨预制梁架设,利用两跨桥面作为架桥机提梁平台;在两幅桥浇筑龙门吊轨道基础、安装龙门吊,采用龙门吊从两幅桥中间的空隙将桥下预制梁提吊到桥上,供架桥机提梁安装。本发明不仅能解决桥头无法运梁的问题,而且将龙门吊设置在桥上,不受墩高限制,能保证龙门吊施工安全。
Construction method for lifting beam on gantry crane beam
The invention relates to a construction method for lifting a beam on a gantry crane beam, which comprises the following steps of: arranging a beam lifting station in an area suitable for vehicles to pass under a bridge, and transporting a precast beam from a beam field to the lower part of the bridge by using a beam transporting vehicle; two-span continuous bridge piers are selected in a girder lifting station area, erection of two-span precast girders is completed through a truck crane, and two-span bridge floors serve as girder lifting platforms of the bridge girder erection machine; gantry crane rail foundations are poured on the two bridges, gantry cranes are installed, and the precast beams under the bridges are lifted to the bridges from the gap between the two bridges through the gantry cranes so that the bridge erecting machine can lift the beams and install the beams. The problem that the bridge head cannot transport the beam can be solved, the gantry crane is arranged on the bridge and is not limited by the pier height, and the construction safety of the gantry crane can be guaranteed.
本发明涉及一种龙门吊梁上提梁施工方法,在桥下适宜车辆通行区域设置提梁站,用运梁车将预制梁从梁场运至桥下;在提梁站区域选择两跨连续桥墩,用汽车吊完成两跨预制梁架设,利用两跨桥面作为架桥机提梁平台;在两幅桥浇筑龙门吊轨道基础、安装龙门吊,采用龙门吊从两幅桥中间的空隙将桥下预制梁提吊到桥上,供架桥机提梁安装。本发明不仅能解决桥头无法运梁的问题,而且将龙门吊设置在桥上,不受墩高限制,能保证龙门吊施工安全。
Construction method for lifting beam on gantry crane beam
一种龙门吊梁上提梁施工方法
LI XIAOLONG (author) / DUAN WEIXU (author) / ZHU XIAOLIANG (author) / LIU JIANGYAN (author) / QUAN BAO'AN (author) / SHI WENTONG (author) / WEN SIYANG (author) / YANG JUEYU (author)
2023-07-25
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction method of tire type gantry crane frame beam
European Patent Office | 2015
|100t span pier gantry crane assembly type segmental beam assembly construction method
European Patent Office | 2022
|Gantry crane multidirectional walking construction method
European Patent Office | 2022
|Construction method for gantry crane track beam to stretch across large-diameter shield end well
European Patent Office | 2023
|