A platform for research: civil engineering, architecture and urbanism
Pipe pile anti-corrosion and high-pressure equal-diameter deep stirring double-protection construction method
The invention discloses a tubular pile anti-corrosion and high-pressure equal-diameter deep-layer stirring double-protection construction method, which belongs to the technical field of building construction, and simplifies the on-site construction procedure, reduces the on-site operation time, standardizes the tubular pile factory, preforms the tubular pile in a large scale, integrally forms the component structure, is convenient to operate, guarantees the quality and improves the construction efficiency in the manufacturing process of a stiff composite pile at a foundation stage. The labor loss can be effectively reduced, the cost is saved, the construction period is shortened, the construction efficiency and safety are improved, and the practicability is high.
本发明公开了一种管桩防腐+高压等径深层搅拌双保护施工方法,属于建筑施工技术领域,其在基础阶段劲性复合桩制作过程中,简化现场施工工序,减少现场作业时间,管桩工厂标准化、规模化预制,构件结构一体成型,操作方便,质量有保障,可有效减少人工损耗,节约成本,缩短施工工期,提升施工效率和安全性,实用性强。
Pipe pile anti-corrosion and high-pressure equal-diameter deep stirring double-protection construction method
The invention discloses a tubular pile anti-corrosion and high-pressure equal-diameter deep-layer stirring double-protection construction method, which belongs to the technical field of building construction, and simplifies the on-site construction procedure, reduces the on-site operation time, standardizes the tubular pile factory, preforms the tubular pile in a large scale, integrally forms the component structure, is convenient to operate, guarantees the quality and improves the construction efficiency in the manufacturing process of a stiff composite pile at a foundation stage. The labor loss can be effectively reduced, the cost is saved, the construction period is shortened, the construction efficiency and safety are improved, and the practicability is high.
本发明公开了一种管桩防腐+高压等径深层搅拌双保护施工方法,属于建筑施工技术领域,其在基础阶段劲性复合桩制作过程中,简化现场施工工序,减少现场作业时间,管桩工厂标准化、规模化预制,构件结构一体成型,操作方便,质量有保障,可有效减少人工损耗,节约成本,缩短施工工期,提升施工效率和安全性,实用性强。
Pipe pile anti-corrosion and high-pressure equal-diameter deep stirring double-protection construction method
一种管桩防腐+高压等径深层搅拌双保护施工方法
JIANG FUSHENG (author) / ZHANG PUCHAO (author) / CAO JIE (author) / LI HUANHUAN (author)
2023-07-25
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
European Patent Office | 2021
|European Patent Office | 2023
|Stirring blade structure for large-diameter stirring pile construction drilling tool
European Patent Office | 2022
|Porous pipe method large-diameter high-pressure jet grouting pile construction method
European Patent Office | 2015
|European Patent Office | 2020
|