Synchronous construction method for high and steep slope
The invention discloses a synchronous construction method for a high and steep slope, and relates to the technical field of slope construction, and the method comprises the following steps: dividing a plurality of construction areas along the height direction of a slope surface; a row of first anti-slide pile sets are installed between every two adjacent construction areas; and after a passive protective net is erected on the top of the first anti-slide pile set, slope protection construction is synchronously conducted on the multiple construction areas. By dividing a plurality of construction areas, installing a row of first anti-slide pile groups between every two adjacent construction areas and erecting a passive anti-slide net, it can be guaranteed that every two adjacent construction areas are relatively independent, and through partition of the passive anti-slide net, the situation that constructors in the adjacent areas are injured by concrete or gravel in the construction process is avoided; therefore, synchronous construction of multiple areas can be achieved, and the construction efficiency is improved.
本发明公开了一种高陡边坡的同步施工方法,涉及边坡施工筑造技术领域,该方法包括沿坡面高度方向划分多个施工区域;在相邻两个上述施工区域之间安装一排第一抗滑桩组;待在上述第一抗滑桩组顶部架设被动防护网后,多个上述施工区域同步进行边坡防护施工。通过划分多个施工区域,并在相邻两个施工区域之间安装一排第一抗滑桩组,架设被动防滑网后,即可以保证相邻两个施工区域的相对独立,且通过被动防护网的隔断,避免施工中的混凝土或砂石对相邻区域施工人员造成伤害,从而可以实现多个区域的同步施工,提高了施工效率。
Synchronous construction method for high and steep slope
The invention discloses a synchronous construction method for a high and steep slope, and relates to the technical field of slope construction, and the method comprises the following steps: dividing a plurality of construction areas along the height direction of a slope surface; a row of first anti-slide pile sets are installed between every two adjacent construction areas; and after a passive protective net is erected on the top of the first anti-slide pile set, slope protection construction is synchronously conducted on the multiple construction areas. By dividing a plurality of construction areas, installing a row of first anti-slide pile groups between every two adjacent construction areas and erecting a passive anti-slide net, it can be guaranteed that every two adjacent construction areas are relatively independent, and through partition of the passive anti-slide net, the situation that constructors in the adjacent areas are injured by concrete or gravel in the construction process is avoided; therefore, synchronous construction of multiple areas can be achieved, and the construction efficiency is improved.
本发明公开了一种高陡边坡的同步施工方法,涉及边坡施工筑造技术领域,该方法包括沿坡面高度方向划分多个施工区域;在相邻两个上述施工区域之间安装一排第一抗滑桩组;待在上述第一抗滑桩组顶部架设被动防护网后,多个上述施工区域同步进行边坡防护施工。通过划分多个施工区域,并在相邻两个施工区域之间安装一排第一抗滑桩组,架设被动防滑网后,即可以保证相邻两个施工区域的相对独立,且通过被动防护网的隔断,避免施工中的混凝土或砂石对相邻区域施工人员造成伤害,从而可以实现多个区域的同步施工,提高了施工效率。
Synchronous construction method for high and steep slope
一种高陡边坡的同步施工方法
LI YANZHE (author) / ZHAO WANCHAO (author) / ZHAO ZILONG (author) / TAN HAO (author) / LI XIN (author) / YU WENZHI (author) / GAO XIN (author) / ZHOU ZHENGZHONG (author) / LIANG JINFENG (author) / FANG KANG (author)
2023-07-25
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underlayments for Steep-Slope Roof Construction
British Library Conference Proceedings | 1995
|European Patent Office | 2023
|Construction method for treating high-side steep slope landslide
European Patent Office | 2020
|Construction method of high-fill steep fitting slope roadbed
European Patent Office | 2023
|