A platform for research: civil engineering, architecture and urbanism
Intelligent maintenance system for high pier column creeping formwork construction and maintenance method thereof
The invention discloses an intelligent maintenance system for high pier column creeping formwork construction and a maintenance method thereof, and belongs to the field of bridge construction. The curing system comprises sealing partition plates arranged on the periphery of square column concrete in a surrounding mode, the construction height of the square column concrete is increased, the multiple layers of sealing partition plates are sequentially distributed upwards, the outer sides of every two adjacent layers of sealing partition plates are connected with side plates correspondingly, and curing cavity layers are formed between the upper-layer sealing partition plate and the lower-layer sealing partition plate and the side plates. An air temperature and humidity sensor and an infrared temperature detector which is distributed close to one side of the square column concrete are arranged in each curing cavity layer; an atomizer and a water flow controller are further arranged in the health preserving cavity layer; and a semiconductor temperature control unit is arranged on the side plate. The maintenance system can automatically measure and control water retention, intelligent control over the pier column and the water temperature is achieved, and the maintenance system can be suitable for construction maintenance of the square high pier column.
本发明公开了一种高墩柱爬模施工智能养生系统及其养生方法,属于桥梁施工领域。本发明的养生系统,包括环绕设置在方柱混凝土外周的封隔板,沿方柱混凝土的施工高度增加,多层封隔板依次向上分布,相邻两层封隔板外侧分别连接有侧板,上下层封隔板和侧板之间形成养生腔层,每层养生腔层内分别设有空气温湿度传感器,以及靠近方柱混凝土一侧分布的红外测温器;养生腔层内还设有雾化器和水流量控制器;侧板上设有半导体温度控制单元。本发明的养生系统能够自动测量控制保水,实现墩柱与水温的智能化控制,并能适用于方形高墩柱的施工养生。
Intelligent maintenance system for high pier column creeping formwork construction and maintenance method thereof
The invention discloses an intelligent maintenance system for high pier column creeping formwork construction and a maintenance method thereof, and belongs to the field of bridge construction. The curing system comprises sealing partition plates arranged on the periphery of square column concrete in a surrounding mode, the construction height of the square column concrete is increased, the multiple layers of sealing partition plates are sequentially distributed upwards, the outer sides of every two adjacent layers of sealing partition plates are connected with side plates correspondingly, and curing cavity layers are formed between the upper-layer sealing partition plate and the lower-layer sealing partition plate and the side plates. An air temperature and humidity sensor and an infrared temperature detector which is distributed close to one side of the square column concrete are arranged in each curing cavity layer; an atomizer and a water flow controller are further arranged in the health preserving cavity layer; and a semiconductor temperature control unit is arranged on the side plate. The maintenance system can automatically measure and control water retention, intelligent control over the pier column and the water temperature is achieved, and the maintenance system can be suitable for construction maintenance of the square high pier column.
本发明公开了一种高墩柱爬模施工智能养生系统及其养生方法,属于桥梁施工领域。本发明的养生系统,包括环绕设置在方柱混凝土外周的封隔板,沿方柱混凝土的施工高度增加,多层封隔板依次向上分布,相邻两层封隔板外侧分别连接有侧板,上下层封隔板和侧板之间形成养生腔层,每层养生腔层内分别设有空气温湿度传感器,以及靠近方柱混凝土一侧分布的红外测温器;养生腔层内还设有雾化器和水流量控制器;侧板上设有半导体温度控制单元。本发明的养生系统能够自动测量控制保水,实现墩柱与水温的智能化控制,并能适用于方形高墩柱的施工养生。
Intelligent maintenance system for high pier column creeping formwork construction and maintenance method thereof
一种高墩柱爬模施工智能养生系统及其养生方法
CHEN SHUXIA (author) / HU YI (author) / LI XINWEN (author) / CHEN BO (author) / ZHAO GUOHUI (author) / YANG BING (author)
2023-07-28
Patent
Electronic Resource
Chinese
Bridge pier column creeping formwork construction system and construction method thereof
European Patent Office | 2024
|Intelligent maintenance system and method for main tower creeping formwork construction
European Patent Office | 2023
|Bridge abutment high pier hydraulic creeping formwork construction method
European Patent Office | 2023
|Expressway bridge high pier hydraulic creeping formwork construction method
European Patent Office | 2024
|