Construction method of super-long prestressed pipe pile for compacting sand layer
The invention discloses a construction method of an ultra-long prestressed pipe pile for compacting a sand layer, which comprises the following steps of: dividing the ultra-long prestressed pipe pile into a plurality of section piles, and numbering from bottom to top; piling and splicing the piles at the same time until the super-long prestressed pipe pile is formed; sinking the super-long prestressed pipe pile to the designed depth of the bottom; earth is excavated to the designed elevation of the top of the super-long prestressed pipe pile; the part, located above the top design elevation, of the super-long prestressed pipe pile is cut off; a high-pressure water gun is used for conducting pile core soil cleaning on the super-long prestressed pipe pile, and the pile core soil cleaning is stopped when the pile core soil cleaning is conducted to the connecting point of the two uppermost section piles; water in the pile core is discharged through a water suction pump; and a reinforcement cage is hoisted to the pile core, concrete pouring is conducted, and the construction efficiency is improved by adopting the construction method of the super-long prestressed pipe pile.
本发明公开了一种用于密实砂层的超长预应力管桩的施工方法,包括步骤:将所述超长预应力管桩分割成多段节桩,并自下而上进行编号;一边打桩一边接桩直到形成所述超长预应力管桩;将所述超长预应力管桩向下沉桩直到底部设计深度;土方开挖至所述超长预应力管桩的顶部设计标高;将所述超长预应力管桩位于顶部设计标高以上的部分截断;利用高压水枪对所述超长预应力管桩进行桩芯清土,并在清至最上方两节所述节桩的连接点时停止;利用抽水泵将桩芯内的水排出;将钢筋笼吊装至所述桩芯并进行混凝土浇筑,通过采用所述超长预应力管桩的施工方法,提高了施工效率。
Construction method of super-long prestressed pipe pile for compacting sand layer
The invention discloses a construction method of an ultra-long prestressed pipe pile for compacting a sand layer, which comprises the following steps of: dividing the ultra-long prestressed pipe pile into a plurality of section piles, and numbering from bottom to top; piling and splicing the piles at the same time until the super-long prestressed pipe pile is formed; sinking the super-long prestressed pipe pile to the designed depth of the bottom; earth is excavated to the designed elevation of the top of the super-long prestressed pipe pile; the part, located above the top design elevation, of the super-long prestressed pipe pile is cut off; a high-pressure water gun is used for conducting pile core soil cleaning on the super-long prestressed pipe pile, and the pile core soil cleaning is stopped when the pile core soil cleaning is conducted to the connecting point of the two uppermost section piles; water in the pile core is discharged through a water suction pump; and a reinforcement cage is hoisted to the pile core, concrete pouring is conducted, and the construction efficiency is improved by adopting the construction method of the super-long prestressed pipe pile.
本发明公开了一种用于密实砂层的超长预应力管桩的施工方法,包括步骤:将所述超长预应力管桩分割成多段节桩,并自下而上进行编号;一边打桩一边接桩直到形成所述超长预应力管桩;将所述超长预应力管桩向下沉桩直到底部设计深度;土方开挖至所述超长预应力管桩的顶部设计标高;将所述超长预应力管桩位于顶部设计标高以上的部分截断;利用高压水枪对所述超长预应力管桩进行桩芯清土,并在清至最上方两节所述节桩的连接点时停止;利用抽水泵将桩芯内的水排出;将钢筋笼吊装至所述桩芯并进行混凝土浇筑,通过采用所述超长预应力管桩的施工方法,提高了施工效率。
Construction method of super-long prestressed pipe pile for compacting sand layer
用于密实砂层的超长预应力管桩的施工方法
WU YIHUA (author) / FANG NENGRONG (author) / LIN ZHILONG (author) / GUAN ENSHAN (author) / YANG KAI (author) / YU GUOLIANG (author) / JIANG ZHUOFENG (author) / ZHANG QIANG (author) / ZHONG SHUWEN (author) / WANG ZIRUI (author)
2023-07-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for hoisting and aligning super-long prestressed pipe pile to pile position
European Patent Office | 2023
|Construction method of prestressed pipe pile and specially-made prestressed pipe pile thereof
European Patent Office | 2020
|Pile planting construction method for prestressed pipe pile
European Patent Office | 2023
|