A platform for research: civil engineering, architecture and urbanism
Walking diaphragm plate construction platform and installation method
The invention relates to a walkable diaphragm plate construction platform and a mounting method, and belongs to the technical field of building construction. A bracket support (8) of the construction platform is arranged on the outer wall of a hoop (7), the two ends of a profile steel frame body (6) are arranged on the bracket support (8), a profile steel guide rail (5) is vertically laid so that the profile steel guide rail (5) and the profile steel frame body (6) can form a #-shaped structure, and an electric steel truss (3) slides on the profile steel guide rail (5). The mounting method comprises the steps that a, the hoop (7) is arranged on the pier column (1) in a sleeving mode; b, mounting a profile steel frame body (6) on a bracket bracket (8) on the outer side of the hoop (7); c, the profile steel guide rail (5) is installed on the profile steel frame body (6), and the profile steel guide rail (5) and the profile steel frame body (6) form a #-shaped structure; and d, the electric steel truss (3) is connected to the profile steel guide rail (5) in a sliding mode. The construction platform of the structure is convenient to build and disassemble. The problems that an existing construction platform needs long time to be built and needs to be dismantled after construction is completed, and the construction cost is high are solved.
本发明涉及一种可行走的横隔板施工平台及安装方法,属于建筑施工技术领域。施工平台的牛腿支架(8)设在抱箍(7)外壁上,型钢架体(6)两端设在牛腿支架(8)上,型钢导轨(5)垂直铺设使其与型钢架体(6)成#形结构,电动钢桁架(3)滑动在型钢导轨(5)上。安装方法包括步骤:a、抱箍(7)套设在墩柱(1)上;b、将型钢架体(6)安装在抱箍(7)的外侧牛腿支架(8)上;c、将型钢导轨(5)安装在型钢架体(6)上,且与型钢架体(6)成#形结构;d、将电动钢桁架(3)滑动连接在型钢导轨(5)上。本结构的施工平台便于搭建,便于拆卸。解决现有的施工平台搭建需要较长的时间,在施工完成后需要拆除,施工成本高问题。
Walking diaphragm plate construction platform and installation method
The invention relates to a walkable diaphragm plate construction platform and a mounting method, and belongs to the technical field of building construction. A bracket support (8) of the construction platform is arranged on the outer wall of a hoop (7), the two ends of a profile steel frame body (6) are arranged on the bracket support (8), a profile steel guide rail (5) is vertically laid so that the profile steel guide rail (5) and the profile steel frame body (6) can form a #-shaped structure, and an electric steel truss (3) slides on the profile steel guide rail (5). The mounting method comprises the steps that a, the hoop (7) is arranged on the pier column (1) in a sleeving mode; b, mounting a profile steel frame body (6) on a bracket bracket (8) on the outer side of the hoop (7); c, the profile steel guide rail (5) is installed on the profile steel frame body (6), and the profile steel guide rail (5) and the profile steel frame body (6) form a #-shaped structure; and d, the electric steel truss (3) is connected to the profile steel guide rail (5) in a sliding mode. The construction platform of the structure is convenient to build and disassemble. The problems that an existing construction platform needs long time to be built and needs to be dismantled after construction is completed, and the construction cost is high are solved.
本发明涉及一种可行走的横隔板施工平台及安装方法,属于建筑施工技术领域。施工平台的牛腿支架(8)设在抱箍(7)外壁上,型钢架体(6)两端设在牛腿支架(8)上,型钢导轨(5)垂直铺设使其与型钢架体(6)成#形结构,电动钢桁架(3)滑动在型钢导轨(5)上。安装方法包括步骤:a、抱箍(7)套设在墩柱(1)上;b、将型钢架体(6)安装在抱箍(7)的外侧牛腿支架(8)上;c、将型钢导轨(5)安装在型钢架体(6)上,且与型钢架体(6)成#形结构;d、将电动钢桁架(3)滑动连接在型钢导轨(5)上。本结构的施工平台便于搭建,便于拆卸。解决现有的施工平台搭建需要较长的时间,在施工完成后需要拆除,施工成本高问题。
Walking diaphragm plate construction platform and installation method
一种可行走的横隔板施工平台及安装方法
LIU YONG (author) / GU FENGLIN (author) / YU MINGHAO (author)
2023-08-01
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Transverse diaphragm construction platform and installation method thereof
European Patent Office | 2020
|Railway bridge walking plate, installation structure and installation method
European Patent Office | 2015
|T-beam diaphragm plate thick steel bar installation method
European Patent Office | 2024
|