A platform for research: civil engineering, architecture and urbanism
Temporary flood control embankment structure
The invention relates to the technical field of flood-fighting dams, and discloses a temporary flood-fighting dam structure which comprises a bottom frame, a supporting column is rotatably arranged on the surface of the bottom frame, a baffle is slidably inserted into one side of the supporting column, a splicing mechanism is slidably inserted into the other side of the supporting column, and a bottom connecting piece is inserted into the bottom of the baffle. A support is rotationally arranged on the back face of the supporting column, the end, away from the supporting column, of the support and the surface of the bottom frame are rotationally arranged, and a bottom connecting piece is arranged on the side face of the bottom frame. The temporary flood control embankment structure solves the problems that most of existing temporary flood control embankments are built through sandbags, in the using process, time needs to be consumed for filling, back-and-forth carrying is needed, the sandbags can absorb much water after making contact with flood, the weight is greatly increased, then the sandbags are difficult to build and disassemble, and the construction cost is low. A large amount of manpower needs to be consumed, and the use efficiency is low.
本发明涉及抗洪堤坝技术领域,且公开了一种临时防汛堤结构,包括:底架,所述底架的表面转动设置有支柱,所述支柱的一侧滑动插接有挡板,所述支柱的另一侧滑动插接有拼接机构,所述挡板的底部插接有底接件,所述支柱的背面转动设置有支架,所述支架远离支柱的一端与底架的表面转动设置,所述底架的侧面设置有底接件。该临时防汛堤结构,解决了目前的临时防汛堤大多都是采用沙袋垒砌,在使用过程中,不但需要耗费时间进行装填,还需要来回搬运,而沙袋在接触洪水后会吸收较多水分,以至于重量大幅度提升,进而导致其堆砌与拆卸困难,需要耗费大量人力,使用效率低下等情况。
Temporary flood control embankment structure
The invention relates to the technical field of flood-fighting dams, and discloses a temporary flood-fighting dam structure which comprises a bottom frame, a supporting column is rotatably arranged on the surface of the bottom frame, a baffle is slidably inserted into one side of the supporting column, a splicing mechanism is slidably inserted into the other side of the supporting column, and a bottom connecting piece is inserted into the bottom of the baffle. A support is rotationally arranged on the back face of the supporting column, the end, away from the supporting column, of the support and the surface of the bottom frame are rotationally arranged, and a bottom connecting piece is arranged on the side face of the bottom frame. The temporary flood control embankment structure solves the problems that most of existing temporary flood control embankments are built through sandbags, in the using process, time needs to be consumed for filling, back-and-forth carrying is needed, the sandbags can absorb much water after making contact with flood, the weight is greatly increased, then the sandbags are difficult to build and disassemble, and the construction cost is low. A large amount of manpower needs to be consumed, and the use efficiency is low.
本发明涉及抗洪堤坝技术领域,且公开了一种临时防汛堤结构,包括:底架,所述底架的表面转动设置有支柱,所述支柱的一侧滑动插接有挡板,所述支柱的另一侧滑动插接有拼接机构,所述挡板的底部插接有底接件,所述支柱的背面转动设置有支架,所述支架远离支柱的一端与底架的表面转动设置,所述底架的侧面设置有底接件。该临时防汛堤结构,解决了目前的临时防汛堤大多都是采用沙袋垒砌,在使用过程中,不但需要耗费时间进行装填,还需要来回搬运,而沙袋在接触洪水后会吸收较多水分,以至于重量大幅度提升,进而导致其堆砌与拆卸困难,需要耗费大量人力,使用效率低下等情况。
Temporary flood control embankment structure
一种临时防汛堤结构
ZONG XIAOPING (author) / ZHU PENGYU (author) / CHEN YUN (author) / WANG FENGCHUANG (author) / QIN XIAOMING (author)
2023-08-01
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
FLOOD PREVENTIVE EMBANKMENT OR TSUNAMI PREVENTIVE EMBANKMENT
European Patent Office | 2020
|Folding type movable flood control sub-embankment frame structure
European Patent Office | 2023
|Flood embankment structure for water conservancy project
European Patent Office | 2020
|