Construction method of ecological bank protection component
The invention discloses a construction method of an ecological bank protection component. The construction method comprises the following steps that a, a first concrete wall and a second concrete wall are formed; b, mounting a supporting component; c, ecological bank protection components are installed; d, forming a concrete connecting layer; e, forming a backfill layer; f, forming a first sandy gravel supporting layer; g, forming a sand and gravel supporting layer II; and h, building blocks are laid, and guardrails are arranged on the soil. According to the ecological bank protection construction method, bottom limiting and side limiting can be conducted on an ecological bank protection component hung on a protection slope, the ecological bank protection component cannot topple and move, a second cavity can be conveniently and rapidly filled with sand and cobbles in the later period, meanwhile, the ecological bank protection component can act on a first concrete wall and a second concrete wall, and the construction efficiency is improved. The formed whole structure has a good water retaining and protecting effect, gaps exist between the sand cobbles filled in the second cavity, rooting space can be provided for plants, and on the premise of safety protection, the natural, harmonious and attractive ecological environment of the ecological revetment can be better restored.
本发明公开了一种生态护岸构件的施工方法,包括如下步骤:a、形成混凝土墙一和混凝土墙二;b、安装支撑构件;c、安装生态护岸构件;d、形成混凝土连接层;e、形成回填层;f、形成砂卵石支撑层一;g、形成砂卵石支撑层二;h、铺设砌块,并在土壤上设置护栏。本发明能对吊放到护坡上的生态护岸构件进行底部限位和侧部限位,生态护岸构件不会发生倾倒和移动现象,方便后期在空腔二中快速填入砂卵石,同时能将生态护岸构件作用在混凝土墙一和混凝土墙二上,形成的整体结构具有良好的挡水防护作用,而且空腔二中填入的砂卵石之间存在间隙,可为植物提供扎根空间,在防护安全的前提下,可更好地恢复生态护岸的自然、和谐、美观的生态环境。
Construction method of ecological bank protection component
The invention discloses a construction method of an ecological bank protection component. The construction method comprises the following steps that a, a first concrete wall and a second concrete wall are formed; b, mounting a supporting component; c, ecological bank protection components are installed; d, forming a concrete connecting layer; e, forming a backfill layer; f, forming a first sandy gravel supporting layer; g, forming a sand and gravel supporting layer II; and h, building blocks are laid, and guardrails are arranged on the soil. According to the ecological bank protection construction method, bottom limiting and side limiting can be conducted on an ecological bank protection component hung on a protection slope, the ecological bank protection component cannot topple and move, a second cavity can be conveniently and rapidly filled with sand and cobbles in the later period, meanwhile, the ecological bank protection component can act on a first concrete wall and a second concrete wall, and the construction efficiency is improved. The formed whole structure has a good water retaining and protecting effect, gaps exist between the sand cobbles filled in the second cavity, rooting space can be provided for plants, and on the premise of safety protection, the natural, harmonious and attractive ecological environment of the ecological revetment can be better restored.
本发明公开了一种生态护岸构件的施工方法,包括如下步骤:a、形成混凝土墙一和混凝土墙二;b、安装支撑构件;c、安装生态护岸构件;d、形成混凝土连接层;e、形成回填层;f、形成砂卵石支撑层一;g、形成砂卵石支撑层二;h、铺设砌块,并在土壤上设置护栏。本发明能对吊放到护坡上的生态护岸构件进行底部限位和侧部限位,生态护岸构件不会发生倾倒和移动现象,方便后期在空腔二中快速填入砂卵石,同时能将生态护岸构件作用在混凝土墙一和混凝土墙二上,形成的整体结构具有良好的挡水防护作用,而且空腔二中填入的砂卵石之间存在间隙,可为植物提供扎根空间,在防护安全的前提下,可更好地恢复生态护岸的自然、和谐、美观的生态环境。
Construction method of ecological bank protection component
一种生态护岸构件的施工方法
YU JINHU (author) / YUAN HUI (author) / DAI CHANGQING (author) / ZOU XUN (author) / SUN TIANCI (author)
2023-08-04
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|Ecological bank protection structure and construction method
European Patent Office | 2024
|Ecological bank protection substrate and ecological bank protection method
European Patent Office | 2023
|Ecological bank protection device and ecological bank protection method
European Patent Office | 2021
|Combined ecological bank protection construction structure and construction method
European Patent Office | 2024
|