Rapid construction method for shallow coverage area bearing platform
In order to overcome the overwater construction operation of the bearing platform under the influence of bare rock geology and optimize the existing bearing platform construction technology and process, the invention provides the rapid construction method for the bearing platform in the shallow coverage area, the overwater construction is changed into land construction by building a water stop retaining wall around a low-tide-level bearing platform area in the bearing platform construction of the shallow coverage area, and the construction efficiency is improved. And the mode that the bearing platform reinforcement cage is hoisted after being integrally bound and formed is adopted, the underwater operation time is shortened, the high risk is reduced to the low risk, the construction operation efficiency is greatly improved, the safety is improved, and the bearing platform construction quality is further guaranteed.
本发明为了克服承台受裸岩地质影响下的水上施工作业,优化现有的承台施工技术和工艺,提高了一种浅覆盖区承台快速施工方法,其在浅覆盖区的承台施工,通过在低潮位承台区域四周砌筑止水挡墙,将水上施工化为陆上施工,并采用承台钢筋笼整体绑扎成型后吊装的方式,降低水中作业时间,将高风险降低为低风险,大大提高了施工作业效率,提高了安全性,还保障了承台施工质量。
Rapid construction method for shallow coverage area bearing platform
In order to overcome the overwater construction operation of the bearing platform under the influence of bare rock geology and optimize the existing bearing platform construction technology and process, the invention provides the rapid construction method for the bearing platform in the shallow coverage area, the overwater construction is changed into land construction by building a water stop retaining wall around a low-tide-level bearing platform area in the bearing platform construction of the shallow coverage area, and the construction efficiency is improved. And the mode that the bearing platform reinforcement cage is hoisted after being integrally bound and formed is adopted, the underwater operation time is shortened, the high risk is reduced to the low risk, the construction operation efficiency is greatly improved, the safety is improved, and the bearing platform construction quality is further guaranteed.
本发明为了克服承台受裸岩地质影响下的水上施工作业,优化现有的承台施工技术和工艺,提高了一种浅覆盖区承台快速施工方法,其在浅覆盖区的承台施工,通过在低潮位承台区域四周砌筑止水挡墙,将水上施工化为陆上施工,并采用承台钢筋笼整体绑扎成型后吊装的方式,降低水中作业时间,将高风险降低为低风险,大大提高了施工作业效率,提高了安全性,还保障了承台施工质量。
Rapid construction method for shallow coverage area bearing platform
一种浅覆盖区承台快速施工方法
ZHONG CAN (author) / AN BANG (author) / YANG XIN (author) / WANG LEIDONG (author) / JIANG DONG (author) / HU JIANFEI (author)
2023-08-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Drilling platform in shallow water area and construction method thereof
European Patent Office | 2015
|Rapid bar planting construction method for large-size bearing platform
European Patent Office | 2024
|Bearing platform foundation pit rapid supporting device and construction method thereof
European Patent Office | 2021
|European Patent Office | 2021
|Rapid forming auxiliary device for high bearing platform pile construction
European Patent Office | 2024
|