Integrated design scheme of comprehensive pipe gallery working well
The invention relates to the technical field of pipe gallery working wells, and discloses an integrated design scheme of a comprehensive pipe gallery working well which comprises a ground, a working well body is fixedly installed below the ground, an equipment layer is arranged on the uppermost portion in the working well body, and a high-pressure pipeline layer is arranged in the working well body and located below the equipment layer. A comprehensive pipeline layer is arranged in the working well body and located below the high-pressure pipeline layer, and pipelines are installed in the high-pressure pipeline layer and the comprehensive pipeline layer in a penetrating mode. Firstly, an equipment layer, a high-pressure pipeline layer and a comprehensive pipeline layer of a working well body are used for providing an underground working space for underground excavation equipment (a pipe jacking machine, a shield tunneling machine and the like) installation debugging, structure assembling and underground excavation construction in the construction period; in the using period, the comprehensive structure serves as a comprehensive structure for achieving the functions of ventilation, fire-fighting drainage, hoisting, pipeline branching, escape, accessory equipment arrangement and the like of the comprehensive pipe gallery.
本发明涉及管廊工作井技术领域,且公开了一种综合管廊工作井的集成设计方案,包括地面,所述地面下方固定安装有工作井本体,所述工作井本体内部最上方开设有设备层,所述工作井本体内部且位于所述设备层下方开设有高压管线层,所述工作井本体内部且位于所述高压管线层下方开设有综合管线层,所述高压管线层和所述综合管线层内部贯穿安装有管道,首先通过工作井本体的设备层、高压管线层和综合管线层为施工期间的暗挖设备(顶管机、盾构机等)安装调试、结构拼装及暗挖施工的提供地下作业空间,在使用期间作为实现综合管廊的通风、消防排水、吊装、管线分支、逃生、附属设备设置等功能的综合构筑物。
Integrated design scheme of comprehensive pipe gallery working well
The invention relates to the technical field of pipe gallery working wells, and discloses an integrated design scheme of a comprehensive pipe gallery working well which comprises a ground, a working well body is fixedly installed below the ground, an equipment layer is arranged on the uppermost portion in the working well body, and a high-pressure pipeline layer is arranged in the working well body and located below the equipment layer. A comprehensive pipeline layer is arranged in the working well body and located below the high-pressure pipeline layer, and pipelines are installed in the high-pressure pipeline layer and the comprehensive pipeline layer in a penetrating mode. Firstly, an equipment layer, a high-pressure pipeline layer and a comprehensive pipeline layer of a working well body are used for providing an underground working space for underground excavation equipment (a pipe jacking machine, a shield tunneling machine and the like) installation debugging, structure assembling and underground excavation construction in the construction period; in the using period, the comprehensive structure serves as a comprehensive structure for achieving the functions of ventilation, fire-fighting drainage, hoisting, pipeline branching, escape, accessory equipment arrangement and the like of the comprehensive pipe gallery.
本发明涉及管廊工作井技术领域,且公开了一种综合管廊工作井的集成设计方案,包括地面,所述地面下方固定安装有工作井本体,所述工作井本体内部最上方开设有设备层,所述工作井本体内部且位于所述设备层下方开设有高压管线层,所述工作井本体内部且位于所述高压管线层下方开设有综合管线层,所述高压管线层和所述综合管线层内部贯穿安装有管道,首先通过工作井本体的设备层、高压管线层和综合管线层为施工期间的暗挖设备(顶管机、盾构机等)安装调试、结构拼装及暗挖施工的提供地下作业空间,在使用期间作为实现综合管廊的通风、消防排水、吊装、管线分支、逃生、附属设备设置等功能的综合构筑物。
Integrated design scheme of comprehensive pipe gallery working well
一种综合管廊工作井的集成设计方案
SHI LEI (author) / CHENG MING-CHUN (author) / FANG LIYU (author) / ZHAO YONGBO (author) / ZHU YIMIN (author) / CAO DEYU (author) / MA WENHUI (author) / YIN SIPING (author) / YU HAIWEI (author)
2023-08-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Non-excavation type deeply-buried comprehensive pipe gallery working well
European Patent Office | 2023
|European Patent Office | 2021
|Comprehensive pipe gallery joint system and comprehensive pipe gallery
European Patent Office | 2021
|