A platform for research: civil engineering, architecture and urbanism
Non-excavation type deeply-buried comprehensive pipe gallery working well
A trenchless deeply-buried comprehensive pipe gallery working well comprises a working well body, the working well body comprises a ground layer, a negative layer, a bottom layer and a hoisting opening, the negative layer is located between the ground layer and the bottom layer, and the hoisting opening penetrates through the ground layer, the negative layer and the bottom layer; the bottom layer is provided with a corridor-entering pipeline cabin and a corridor-entering pipeline incoming and outgoing line wiring port; the ground layer is provided with a ventilating duct, a personnel entrance and exit and an escape exit which are communicated with the negative layer; the negative layer is provided with an equipment room and a vertical ladder stand, and the vertical ladder stand penetrates through the ground layer, the negative layer and the bottom layer and is connected with the personnel access and the escape exit. According to the design of the working well structure, firstly, the requirements of the deeply-buried long-well-spacing pipe gallery for configuration of equipment and all opening parts are met, the requirements for wiring, conversion and hoisting of pipelines entering the gallery are met, and the requirements for ventilation, power distribution and monitoring of the pipe gallery are met; the scale of the working well is controlled according to the burial depth condition, the investment cost of the working well is reduced, and the occupation requirement for urban land is reduced.
一种非开挖式深埋综合管廊工作井,包括工作井本体,工作井本体包括地面层、负层、底层和吊装口,负层处于所述地面层和底层之间,吊装口贯穿于上述地面层、负层、底层;底层设有入廊管线舱室和入廊管线进出线接线口;地面层设有与所述负层相通的通风道、人员出入口、逃生口;负层设有设备用房、垂直爬梯,垂直爬梯贯穿于所述地面层、负层和底层,并与人员出入口、逃生口相连。工作井结构的设计首先满足深埋长井间距管廊对设备、各口部配置需求,满足入廊管线的接线、转换、吊装要求,满足管廊自身的通风、配电、监控需求;其次埋深条件,控制工作井规模,降低工作井投资造价,降低对城市土地的占用需求。
Non-excavation type deeply-buried comprehensive pipe gallery working well
A trenchless deeply-buried comprehensive pipe gallery working well comprises a working well body, the working well body comprises a ground layer, a negative layer, a bottom layer and a hoisting opening, the negative layer is located between the ground layer and the bottom layer, and the hoisting opening penetrates through the ground layer, the negative layer and the bottom layer; the bottom layer is provided with a corridor-entering pipeline cabin and a corridor-entering pipeline incoming and outgoing line wiring port; the ground layer is provided with a ventilating duct, a personnel entrance and exit and an escape exit which are communicated with the negative layer; the negative layer is provided with an equipment room and a vertical ladder stand, and the vertical ladder stand penetrates through the ground layer, the negative layer and the bottom layer and is connected with the personnel access and the escape exit. According to the design of the working well structure, firstly, the requirements of the deeply-buried long-well-spacing pipe gallery for configuration of equipment and all opening parts are met, the requirements for wiring, conversion and hoisting of pipelines entering the gallery are met, and the requirements for ventilation, power distribution and monitoring of the pipe gallery are met; the scale of the working well is controlled according to the burial depth condition, the investment cost of the working well is reduced, and the occupation requirement for urban land is reduced.
一种非开挖式深埋综合管廊工作井,包括工作井本体,工作井本体包括地面层、负层、底层和吊装口,负层处于所述地面层和底层之间,吊装口贯穿于上述地面层、负层、底层;底层设有入廊管线舱室和入廊管线进出线接线口;地面层设有与所述负层相通的通风道、人员出入口、逃生口;负层设有设备用房、垂直爬梯,垂直爬梯贯穿于所述地面层、负层和底层,并与人员出入口、逃生口相连。工作井结构的设计首先满足深埋长井间距管廊对设备、各口部配置需求,满足入廊管线的接线、转换、吊装要求,满足管廊自身的通风、配电、监控需求;其次埋深条件,控制工作井规模,降低工作井投资造价,降低对城市土地的占用需求。
Non-excavation type deeply-buried comprehensive pipe gallery working well
一种非开挖式深埋综合管廊工作井
SUN JING (author) / WANG XIAONA (author) / LI LINLIN (author) / XIE FENGBO (author) / DAI YONGXING (author) / MENG JINLING (author) / ZOU XIAOWEN (author) / LIN WEIHE (author) / CHEN XIAOLI (author)
2023-03-21
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for crossing obstacles on deeply-buried underground comprehensive pipe gallery
European Patent Office | 2024
|Vertical temporary supporting device for shallow-buried excavation pipe gallery
European Patent Office | 2020
|Integrated design scheme of comprehensive pipe gallery working well
European Patent Office | 2023
|Municipal comprehensive pipe gallery excavation and earthwork transfer method
European Patent Office | 2024
|Construction method of deeply-buried large-diameter single-hole gallery
European Patent Office | 2024
|