A platform for research: civil engineering, architecture and urbanism
Basement outer wall construction joint waterproof construction structure and construction method thereof
The invention discloses a basement exterior wall construction joint waterproof construction structure and a construction method thereof, and belongs to the technical field of construction joint waterproofness, the basement exterior wall construction joint waterproof construction structure comprises pouring steel bars and a water stop steel plate, the pouring steel bars comprise a plurality of horizontal ribs and vertical ribs which are spliced, and the water stop steel plate is provided with an installation mechanism. The installation mechanism comprises a fixing seat, a clamping seat and a clamping movement assembly, the fixing seat is fixedly installed on the water stop steel plate, a gap allowing the horizontal rib to penetrate through is reserved between the clamping seat and the water stop steel plate, and the clamping movement assembly is arranged on the fixing seat and used for driving the clamping seat to move in the direction close to or away from the fixing seat. The device has the advantages that workers can conveniently and rapidly install and fix the water stop steel plate and the pouring steel bars forming the basement outer wall, and the working efficiency is improved.
本发明公开了一种地下室外墙施工缝防水施工结构及其施工方法,属于施工缝防水的技术领域,其包括浇筑钢筋和止水钢板,所述浇筑钢筋包括若干相拼接而成的水平筋条和竖直筋条,所述止水钢板设置有安装机构,所述安装机构包括固定座、夹持座以及夹持运动组件,所述固定座固定安装于止水钢板,所述夹持座与止水钢板之间留有供水平筋条穿过的间隙,所述夹持运动组件设置于固定座并用于驱动夹持座朝靠近或远离固定座的方向运动。本申请具有便于工作人员快速对止水钢板与构成地下室外墙的浇筑钢筋安装固定,提高工作效率的效果。
Basement outer wall construction joint waterproof construction structure and construction method thereof
The invention discloses a basement exterior wall construction joint waterproof construction structure and a construction method thereof, and belongs to the technical field of construction joint waterproofness, the basement exterior wall construction joint waterproof construction structure comprises pouring steel bars and a water stop steel plate, the pouring steel bars comprise a plurality of horizontal ribs and vertical ribs which are spliced, and the water stop steel plate is provided with an installation mechanism. The installation mechanism comprises a fixing seat, a clamping seat and a clamping movement assembly, the fixing seat is fixedly installed on the water stop steel plate, a gap allowing the horizontal rib to penetrate through is reserved between the clamping seat and the water stop steel plate, and the clamping movement assembly is arranged on the fixing seat and used for driving the clamping seat to move in the direction close to or away from the fixing seat. The device has the advantages that workers can conveniently and rapidly install and fix the water stop steel plate and the pouring steel bars forming the basement outer wall, and the working efficiency is improved.
本发明公开了一种地下室外墙施工缝防水施工结构及其施工方法,属于施工缝防水的技术领域,其包括浇筑钢筋和止水钢板,所述浇筑钢筋包括若干相拼接而成的水平筋条和竖直筋条,所述止水钢板设置有安装机构,所述安装机构包括固定座、夹持座以及夹持运动组件,所述固定座固定安装于止水钢板,所述夹持座与止水钢板之间留有供水平筋条穿过的间隙,所述夹持运动组件设置于固定座并用于驱动夹持座朝靠近或远离固定座的方向运动。本申请具有便于工作人员快速对止水钢板与构成地下室外墙的浇筑钢筋安装固定,提高工作效率的效果。
Basement outer wall construction joint waterproof construction structure and construction method thereof
一种地下室外墙施工缝防水施工结构及其施工方法
CHEN GUOXIN (author) / HUANG WUCONG (author) / WANG WENJI (author)
2023-08-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Basement outer wall construction joint waterproof structure and construction method
European Patent Office | 2024
|Basement outer wall waterproof structure and construction method thereof
European Patent Office | 2022
|European Patent Office | 2023
|